Approved Document Construction Management Plan OPW25-0206 · OPW25/0206

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
                                            Incident Reporting
Reporting a      Incident reporting is managed by:
hazard, injury            Completing incident report forms if any hazard/injury/incident occurs, this
or incident               includes near misses
                          Reporting incidents to site supervisors and SEMP Manager
                          Ensuring incident report forms are located in all vehicles accessing the site
                                             Risk Assessment
Risk             Risk is managed by a system of:
Management                Workplace assessment
                          Hazard identification
                          Remedial action
                          Updating WHS
                 Documentation and reports that will be used in this process include:
                          Biodiverse Environmentals Job Safety analysis forms
                          Safe Work Method Statement - SWMS
                                         Training and Induction
Documentation    Training records will be maintained as evidence of training delivery and assessment
                 of competence
Generic WHS      All staff have the skills and knowledge acquired from:
training                  General induction training
                          Using JSA forms
Risk specific    Staff required to conduct activities with a specific health and safety risk have
WHS training     completed relevant training for:
                      • First aid
Task specific    Staff required to conduct activities with a specific health and safety risk have
WHS training     completed training relevant to the project such as:
                      • Agricultural chemical use
                      • Chainsaw use



Appendix 3 – Pedestrian and Traffic Management Plan
                    Traffic matters and safety measures to be implemented
                                         Traffic Management
Traffic             If a formal traffic management plan is identified as being required for tree
Management Plan     clearing works it will include the following:

                    i. a Traffic Management Control Plan in accordance with the Manual of Uniform
                    Traffic Control Devices (MUTCD) detailing all temporary signage and traffic
                    control measures prior to construction;

                    ii. maintenance of safe vehicle and pedestrian access for the areas affected by
                    the works during and after daily construction has ceased;

                    iii. proposed fencing to the site during the construction phase of the
                    development;




                                     P.O. Box 320, Eudlo           E. [email protected]
                                     Queensland, 4554,             P. 0408 011 584 | ABN 18 766 198 454
                                     Australia                     www.biodiverse-environmental.com.au


                               FLORA | FAUNA | REHABILITATION | FIRE | WATER

Used in these records

About this file

File size
1.3 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Approved Document Construction Management Plan OPW25-0206.pdf · 1.3 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.