Approved Document Construction Management Plan OPW25-0206 · OPW25/0206
Plans and drawings: the text below has words only, no drawings.
Speed
Management of Measures to be implemented to ensure onsite vehicle speeds include:
onsite vehicle • Worksite speed limits set at 10km/h, or as indicated onsite
speed
Vehicle Movements
Heavy vehicle Measures to be implemented to ensure safe heavy vehicle access include:
access and • Assess site and trim low lying branches
mobile cranes • Spotter to guide machinery in and out of site.
Licensing and Measures to be implemented to ensure safe operation of vehicles include:
qualifications • Checking licenses and qualifications when recruiting drivers/operators or
hiring contractors
Site access Measures to be implemented to ensure safe access of vehicles include:
• Following entry and exit signage to the site
• Ensuring drivers driving out onto public roads can see both ways along a
footpath before they move onto it
• Ensuring vehicle access is staggered to prevent queuing on roads and
unnecessary disruption to traffic
Road and lane Road closures are not anticipated to be necessary as all of the works are contained
closures within the project footprint
Consultation with the project arborist will identify any needs for traffic control
and/or lane closures
Reversing Measures to be implemented to reduce the need for vehicles to reverse include:
vehicles • Installing a turning circle so vehicles can turn without reversing
When it is necessary to reverse:
• Using reversing sensors, cameras, mirrors and warning devices such as
reversing alarms
• Ensuring workers and site visitors are familiar with reversing areas
• Ensuring drivers who cannot see clearly behind have another person
directing them before reversing
Codes of Practice and Legislation applicable to this Plan
Legislation and Regulations
• Agricultural Chemicals Distribution Control Act 1996 and Regulation 1998
• Chemical Usage (Agricultural and Veterinary) Control Act 1998 and Regulation 1999
• Environmental Protection Act 1994
• Environment Protection and Biodiversity Conservation Act 1999 (Federal)
• Environment Protection and Biodiversity Regulations 2019 (Federal)
• Land Protection (Pest and Stock Route Management) Act 2002
• Local Government Act 2009
• Nature Conservation Act 1992
• Nature Conservation (Administration) Regulation 2017
• Nature Conservation (Wildlife) Regulation 2006
• Nature Conservation (Plants) Regulation 2020
• Nature Conservation (Animal) Regulation 2020
• Nature Conservation (Wildlife Management) Regulation 2006
• Nature Conservation (Protected Are Management) Regulation 2017
• Work Health and Safety Act 2011
• Work Health and Safety Regulation 2011
• Marine Safety (Domestic Commercial Vessel) National Law Act 2016 (National)
• Queensland Building and Construction Commission Act 1991 and Regulation 2003
P.O. Box 320, Eudlo E. [email protected]
Queensland, 4554, P. 0408 011 584 | ABN 18 766 198 454
Australia www.biodiverse-environmental.com.au
FLORA | FAUNA | REHABILITATION | FIRE | WATER
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Approved Document Construction Management Plan OPW25-0206.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.3 MB (small file)
- File type
No other editions are linked here.