SUPERSEDED 51983.3225.06 - Change to an Existing Approval
51983.3225.06
Approved Plans for Unit 15 Redevelopment
Plan No. Rev. Plan, prepared by Date
DA.01 B Location Plan prepared by Bark Design Architects 26/02/2016
DA.02 C Site Plan prepared by Bark Design Architects 23/02/2016
DA.04 C Ground Floor Plan prepared by Bark Design Architects 23/02/2016
DA.05 C First Floor Plan prepared by Bark Design Architects 23/02/2016
DA.06 C Second Floor Plan prepared by Bark Design Architects 23/02/2016
DA.07 C Roof Terrace Plan prepared by Bark Design Architects 23/02/2016
DA.11 B South Elevation prepared by Bark Design Architects 26/02/2016
DA.12 B East Elevation prepared by Bark Design Architects 26/02/2016
DA.13 B North Elevation prepared by Bark Design Architects 26/02/2016
DA.14 B West Elevation prepared by Bark Design Architects 26/02/2016
Additional Privacy Screening
7. Additional privacy screening must be provided to the dwelling’s deck areas, as follows:
a. Screening to the western side of the 1st floor deck (to protect the privacy of Unit
16 The Hastings); &
b. Screening to the northern side and the northern half of the eastern side of the 2nd
floor deck (to protect the privacy of the Sebel units).
Existing Vegetation
8. Existing trees on the site and within road reserves must be retained, except where
required to be removed to accommodate the approved dwelling.
9. Trees to be retained must be protected from clearing or construction activities by:
a. clearly marking vegetation to be retained with flagging tape
b. installing protective fencing around the drip line of the vegetation
c. restricting stockpiling, storage and vehicle parking to those areas which are
already cleared
d. using low impact construction techniques around vegetation.
Construction Management Plan & Pre-Start Meeting
10. A Construction Management Plan must be submitted to and approved by Council prior
to obtaining a building approval and must specifically address the following:
a. Traffic Management during all aspects of the construct phase including.
i. Traffic Management Control Plan in accordance with Manual of Uniform
Traffic Control Devices (MUTCD) detailing all temporary signage and traffic
control measures prior to construction.
ii. Maintenance of safe and unobstructed access across the frontage of the site
for pedestrians and vehicles both during daily construction and after daily
construction has ceased.
iii. Parking arrangements, number, and locations for vehicles associated with
the proposed construction works that need to be onsite or in proximity to the
Page 4 of 8
Document Set ID: 20066023
Version: 2, Version Date: 13/05/2016
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SUPERSEDED 51983.3225.06 - Change to an Existing ApprovalRelated documentApplication case desk ↗
About this file
- File size
- 242 KB (small file)
- File type
No other editions are linked here.