site at any time during the phases of the construction works. Where
relevant, time slots and off-peak hours should be indicated. All efforts must
be made to prevent or minimise adverse impact on public parking availability
in the local area.
b. Works programme identifying key components of the works and their respective
durations.
c. Written confirmation from the Body Cooperate accepting the use of the common
property for activities associated with the construction works as identified in the
final Construction Management Plan and the Traffic Management Plan.
d. Proposed fencing to the site during the construction phase of the development.
e. Protection fencing for existing landscaping and trees in proximity to the work
activities.
f. Maintenance and protection of water quality and existing drainage lines through
the construction site through the implementation of appropriate erosion and
sediment control measures to prevent silt and contaminants from entering existing
stormwater system.
g. Establishment of a communication protocol with the general public, adjoining
owners, emergency services and local businesses to advise of agreed
construction times, impacts on traffic and services and other relevant issues.
h. identification of complaint management procedures including:
i. Contact details for the on-site manager.
ii. Dispute resolution procedures.
11. Council must be contacted at least 5 working days prior to any works commencing to
organise a pre-start meeting. The contact number to arrange a pre-start meeting is Leigh
Crighton on ph.53296547. The pre-start meeting must include:
a. The relevant parties for any Civil Engineering and Building works.
b. A representative of the Body Cooperate.
The applicant must provide copies of the approved construction and traffic
management plans for the attendees at the prestart meeting.
Frontage Condition Report
12. A condition report including photographs of the frontage of the site must be completed
and submitted to council at the prestart meeting and prior to any works commencing.
General Requirements
13. Any conflict between the development and an existing or proposed service must be
referred to the relevant service authority for determination prior to commencement of
works.
14. The developer must meet any costs to repair damage to any Council asset during
construction where damage is a result of the development works. Damage to assets
must be repaired immediately where it creates a hazard to the community. In
circumstances where the damage does not create a hazard to the community, it must be
repaired immediately on completion of the works associated with the development.
Page 5 of 8
Document Set ID: 20066023
Version: 2, Version Date: 13/05/2016
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SUPERSEDED 51983.3225.06 - Change to an Existing ApprovalRelated documentApplication case desk ↗
About this file
- File size
- 242 KB (small file)
- File type
No other editions are linked here.