Council archive · source document
Planning Report 3032 · REC13/0148
10
Specific Outcomes Proposed Solutions
d) minimise exposure to prevailing winter winds.
Infrastructure
O15 Each lot is capable of being serviced by All lots will be connected to power supply,
appropriate levels of— telecommunications services, water
a) water supply; supply and sewerage reticulation.
b) reticulated sewerage;
c) stormwater drainage; The proposed location of the Lots in
d) power supply; and relation to existing infrastructure allows for
e) telecommunications; services to be provided in an efficient
AND manner with minimal impact on the
O16 The design and provision of public services and environment.
utilities, including sewerage, water, electricity, street
lighting and telecommunication services—
a) meets the needs of users;
b) ensures health, safety and convenience of the
community;
c) protects the natural environmental values of
the site and surrounds, including visual amenity
and native vegetation;
d) are cost effective over their life cycle;
e) minimises adverse impacts to the environment
(including the amenity of the local area) in the
short and long term; and
f) ensures that the existing systems are upgraded
or relocated to be capable of supporting the
proposed development;
AND
O17 Essential public utilities are available and
maintain their function during flood events up to a 1%
AEP (1:100 year ARI) flood event.
Electricity supply infrastructure No proposed lots are located in close
O18 Uses and works maintain a safe distance from proximity to any electrical supply
electrical infrastructure including substations, infrastructure.
overhead power lines, power poles and transformers.
Earthworks and stormwater management
O19 Stormwater run-off is managed so as not to Each lot has appropriate means of
cause any adverse impacts on the built or natural disposing stormwater with the topography
environment including changes in quality, quantity or allowing for all stormwater from the
location of stormwater discharges. proposed Lots to flow into the drainage
lines and watercourse.
O20 Filling or excavation only occurs where it does The existing drainage lines that traverse
not adversely impact on— the site will be retained and are not
a) watercourses, drainage lines and wetlands; or located near the Proposed Lots.
b) vegetation on land identified on Biodiversity
Overlay Maps OM1.1-OM9.1; or There will no impact on any areas of high
c) water levels on properties elsewhere. ecological value of the site.
Any filling will ensure that it does not
contribute to additional flooding on nearby
properties.
Landscaping and visual amenity
O21 Land development responds to the distinctive The natural landform and landscape are
landscape character of the site by utilising the natural not significantly modified to accommodate
features of the site, which include— the development.
a) watercourses and drainage lines;
b) significant trees;
c) understorey vegetation;
d) rock outcrops; and
10
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Planning Report 3032Related documentApplication case desk ↗
About this file
- File size
- 1.6 MB (small file)
- File type
No other editions are linked here.