Original source · versioned page text
2015-06-23 Planning & Organisation Committee Meeting Agenda
The original of this document is very large (12.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 23 JUNE 2015 RECOMMENDATION That Council note the report by the Development Planner to the Planning & Organisation Committee Meeting dated 23 June 2015 regarding Application No. REC15/0010 for a Development Permit for Reconfiguration of a Lot – 1 lot into 2 lots situated at 38 Pavilion Street, Pomona and: A. Approve the application in accordance with the following conditions: When Conditions Must Be Complied With 1. Unless otherwise stated, all works required by the conditions of this Decision Notice must be completed prior to submission of the subdivision plan to Council for compliance assessment. Approved Plans 2. Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions. Plan No. Rev. Plan/Document Name Date 15-3836AB Plan of Proposed Reconfiguration of Lot 16-03-15 1 on RP196894, prepared by Max Watterson & Associates Performance Bond 3. Security in the form of a cash bond or trading bank guarantee to the sum of $5,000 must be submitted to Council, to secure performance of all conditions of this approval, prior to the issue of a Development Permit for Operational Works. The cash bond or trading bank guarantee will be returned on performance of the conditions of approval less any costs incurred by Council in respect of enforcing performance of this permit. Council reserves the right to call upon the bond or guaranteed sum to effect compliance with conditions. External Works 4. The north eastern corner of the intersection of Pavilion Street and Tree Street must be upgraded. The works must be undertaken in accordance with an Operational Works approval and must include in particular: a. provision of kerb and channel at the intersection and extending a minimum of 6 metres along the Pavilion Street and Tree Street frontages b. any associated widening of the existing pavement including suitable tapers in Pavilion Street and Tree Street. c. runoff from the kerb and channel directed to the existing table drain in Pavilion Street This condition is imposed pursuant to s665 of the Sustainable Planning Act 2009 being non-trunk infrastructure. 5. To minimise the amount of surface runoff from the Tree Street road verge entering the site, minor regrading of the verge area must be undertaken. The works must be undertaken generally in accordance with drawing number 1511- 02A prepared by Callghan and Toth dated May 2015. The works must be undertaken in accordance with an Operational Works approval. Stormwater Drainage 6. Stormwater runoff from proposed Lot 1 must be discharged into Council’s existing drainage system in Pavilion Street Page 43 of 123
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.