2015-06-23 Planning & Organisation Committee Meeting Agenda

of 123

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (12.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                 23 JUNE 2015


    7.    Stormwater runoff from proposed Lot 2 must be disposed of on-site without
          causing scour or damage to the subject site or any adjoining property. The on-
          site system must be constructed generally in accordance with drawing number
          1511-01A prepared by Callaghan and Toth dated May 2015. The construction of
          the on-site system must be undertaken as part of a Building Permit.
          Water & Sewer Connections
    8.    An underground connection to reticulated water and sewerage must be provided
          to each lot in accordance with the standards and requirements of Northern SEQ
          Distributor–Retailer Authority (Unitywater).
    9.    A Certificate of Completion from the Northern SEQ Distributor–Retailer Authority
          (Unitywater) must be submitted to Council that certifies an underground
          connection to reticulated water and sewerage has been provided to each lot.
          Electricity and Telecommunication Services
    10.   Reticulated electricity and telecommunication services must be provided to each
          lot in accordance with an approval for Operational Works and the standards and
          requirements of the relevant service provider.
    11.   Unless otherwise stipulated by telecommunications legislation at the time of
          construction, the development must be provided with all necessary conduits, pits
          and pipes to accommodate the future connection of optic fibre technology
          telecommunications.
    12.   Certification must be submitted to Council from all relevant service providers
          which certifies that the development has met the requirements of this Decision
          Notice and all applicable legislation at the time of construction.
          Easements
    13.   Unless otherwise agreed in writing by the relevant service provider, any public or
          third party infrastructure located on the subject site must be placed within an
          easement registered against the title of the property.
    14.   All easements must be designed in accordance with the planning scheme and
          granted at no cost to the Grantee. Where the Grantee is Council or a service
          authority, the easement documentation must be in accordance with the
          Grantee’s standard easement terms. Draft easement documentation must be
          submitted to Council for endorsement.
    15.   All works must be kept clear of any existing or proposed easements on the
          subject land, unless agreed otherwise in writing by the Grantee.
          Damage to Services and Assets
    16.   Any damage caused to existing services and assets as a result of the
          development works must be repaired at no cost to the asset owner at the
          following times:
          a.   where the damage would cause a hazard to pedestrian or vehicle safety,
               immediately; or
          b.   where otherwise, upon completion of the works associated with the
               development.
          Any repair work which proposes to alter the alignment or level of existing
          services and assets must first be referred to the relevant service authority for
          approval.




                                                                                Page 44 of 123
Log in to download the original file

2015-06-23 Planning & Organisation Committee Meeting Agenda(PDF, 12MB).pdf · 12.7 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.