Original source · versioned page text
2015-06-23 Planning & Organisation Committee Meeting Agenda
The original of this document is very large (12.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 23 JUNE 2015
Locality Provisions
The proposal complies with the provisions of the Mary River Catchment Locality Code as the
proposal is located within a well-established area of Pomona.
Land Use & Works Provisions
The following codes which regulate land use and design are most applicable to this
application:
Reconfiguring a Lot Code
Engineering Works Codes
The application has been assessed against each of the above applicable codes. The
pertinent issues arising out of the assessment against the codes are discussed below:
Lot Size
Probable Solution S1.1 and Specific Outcome O1 of the Reconfiguring a Lot Code require a
minimum lot size of 1000m² for sewered lots in Pomona. The proposed lots do not meet the
required 1000m² being 938m² each. The lot size is therefore assessed against the most
relevant Overall Outcomes of the Code which read as follows:
The overall outcomes sought by the Reconfiguring a Lot Code are to ensure that any
reconfiguring of lots results in—
a) lot sizes and dimensions that are appropriate for their intended use;
b) compatible relationships between land uses;
c) lots with suitable, safe and appropriate access;
d) acceptable impacts on watercourses, drainage lines, wetlands and other
environmentally sensitive areas;
e) an effective and efficient road network that is designed to integrate with the natural
topography;
f) provision of safe facilities for walking, cycling and public transport;
g lots that avoid significant adverse effects on the natural environment and landscape
and minimise the risk of hazards for people and property;
h) effective and efficient provision of relevant infrastructure and community services that
meet future needs;
i) promotion of social interaction and community activity;
j) provision of an accessible and useable network of open space for local communities;
k) lots that are designed and orientated to accommodate energy efficient building design;
l) residential development which is consistent with the developed character of its
particular neighbourhood
The proposed lots are both sewered and suitably sized for their intended use being for
detached housing with Lot 1 accommodating an existing dwelling that complies with setback
provisions and Lot 2 sufficient for a dwelling, being 936m². The proposed lots are identical in
size to 21 of the 25 lots in Tree Street and similar to those in the surrounding area, some of
which are smaller than that proposed. The proposed lot size, being the reinstatement of the
original lots is consistent with the established character of the area. Access to the proposed
Lot 1 will remain unchanged and lot 2 will require a standard cross over similar to those
which exist in Tree Street.
Page 48 of 123
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.