Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

2015-06-23 Planning & Organisation Committee Meeting Agenda

of 123

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (12.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                          23 JUNE 2015


Frontage Works
Probable Solution S13.1 of the Transport, Roads and Drainage Code requires frontage
works be provided to the full frontage of the site. The applicant does not propose any
frontage works. The development is therefore required to be assessed against Specific
Outcome O13 which states:
Specific Outcome O13 - Development is provided with external roadworks along the full
extent of the frontage of the site to an appropriate standard having regard to the specified
function of the road.
Officers agree with the applicant that a footpath and, for the majority of the frontage, kerb
and channel is not necessary because:
    there is currently no frontage works in Tree Street and only disconnected sections of
      kerb and channel and no footpath on the eastern side of Pavilion Street
    there is no further potential for developments which would require frontage works in
      Tree Street and only limited subdivision opportunities on the western side of Pavilion
      Street where kerb and channel and a footpath already exist
    a lack of existing infrastructure to connect to (Pavilion and Tree Streets)
    the table drain located to the frontage is in good condition and generally functions well
      with only some minor reprofiling required in the Tree Street verge for stormwater
      management. Figure 3 below shows the corner and the condition of the table drain.
However, some kerb and channel is warranted as minor damage exists to the road
formation, by what appears to be caused by vehicles ‘cutting’ the corner. The damage can
be seen circled in Figure 3 below. To improve the road, it is recommended the applicant
construct a kerb return at the intersection extending for approximately 6 metres along each
frontage, which is consistent with other works nearby.




Figure 3 - Frontage of Pavilion Street on the left and Tree Street on the right. Road formation damage
circled in red.

Boundary truncation
Planning Scheme Policy PSP 5 – Engineering Design Standards for Roads, Drainage and
Earthworks requires a truncation to the corner of proposed Lot 1. In this instance, given the
wide road reserve and good sight lines; it is considered the truncation is not necessary.
Photo 3 above (image on the left) provides an indication of the sight lines from Tree Street.

                                                                                         Page 49 of 123
Log in to download the original file

2015-06-23 Planning & Organisation Committee Meeting Agenda(PDF, 12MB).pdf · 12.7 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.