EXECUTIVE!SUMMARY! I!
1! INTRODUCTION! 1!
1.1! SITE!CHARACTERISTICS! 1!
1.2! PREVIOUS!INVESTIGATIONS! 2!
2! STORMWATER!QUALITY! 5!
2.1! DESIGN!OBJECTIVES! 5!
2.2! STORMWATER!QUALITY!TREATMENT! 5!
2.2.1! STRATEGY! 5!
2.3! MODELLING!APPROACH! 6!
2.3.1! PHILOSOPHY! 6!
2.3.2! MUSIC!SETUP! 7!
2.3.3! CATCHMENT!AREAS! 8!
2.3.4! MUSIC!MODEL!LAYOUT! 8!
2.4! TREATMENT!MEASURES! 9!
2.4.1! RAINWATER!TANKS! 9!
2.4.2! BIORETENTION!SYSTEM! 10!
2.4.3! SEDIMENT!FOREBAYS! 11!
2.5! RESULTS! 13!
3! STORMWATER!QUANTITY! 14!
3.1! SITE!DRAINAGE!AND!CATCHMENT!DEFINITION! 14!
3.2! EXISTING!SCENARIO! 15!
3.3! RATIONAL!METHOD!CALIBRATION! 16!
3.4! DEVELOPED!SCENARIO! 16!
3.5! MITIGATED!SCENARIO! 18!
4! DETAILED!DESIGN!DOCUMENTATION! 20!
5! BIORETENTION!MAINTENANCE!MANUAL! 21!
6! WATER!QUALITY!MONITORING! 22!
6.1! CONSTRUCTION! 22!
6.2! OPERATIONAL! 22!
7! CONCLUSIONS! 23!
8! REFERENCES! 24!
!
!
APPENDICES!
!
Appendix!1:!OPW!Drawings!and!FLOTH!Design!Drawings! 25!
Appendix!2:!Rational!Method! 26!
Appendix!3:!WBNM!results! 27!
Appendix!4:!Bioretention!Maintenance!Manual! 28!
!
[OCR of page images]
aqua
Contents
EXECUTIVE SUMMARY I
1 INTRODUCTION 1
1.1. SiTE CHARACTERISTICS 1
1.2. PREVIOUS INVESTIGATIONS 2
2 STORMWATER QUALITY 5
2.1 DESIGN OBJECTIVES 5
2.2 STORMWATER QUALITY TREATMENT 5
2.2.1 STRATEGY 5
2.3. MODELLING APPROACH 6
2.3.1 PHILOSOPHY 6
2.3.2 MUSIC SETUP 7
2.3.3. CATCHMENT AREAS 8
2.3.4 MUSIC MobDEL LAYOUT 8
2.4 TREATMENT MEASURES 9
2.4.1 RAINWATER TANKS 9
2.4.2. BIORETENTION SYSTEM 10
2.4.3. SEDIMENT FOREBAYS 11
2.5 RESULTS 13
3 STORMWATER QUANTITY 14
3.1 SITE DRAINAGE AND CATCHMENT DEFINITION 14
3.2 EXISTING SCENARIO 15
3.3. RATIONAL METHOD CALIBRATION 16
3.4 DEVELOPED SCENARIO 16
3.5 MITIGATED SCENARIO 18
4 DETAILED DESIGN DOCUMENTATION 20
5 BIORETENTION MAINTENANCE MANUAL 21
6 WATER QUALITY MONITORING 22
6.1 CONSTRUCTION 22
6.2 OPERATIONAL 22
7 CONCLUSIONS 23
8 REFERENCES 24
APPENDICES
Appendix 1: OPW Drawings and FLOTH Design Drawings 25
Appendix 2: Rational Method 26
Appendix 3: WBNM results 27
Appendix 4: Bioretention Maintenance Manual 28
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
OPW16/0021- Operational Works Application 2 of 4Related documentApplication case desk ↗
About this file
- File size
- 21.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.