Council archive · source document
OPW16/0021- Operational Works Application 2 of 4
Very large file (21.8 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
!
!
!
!
!
FIGURES!
!
Figure!1:!Locality!Plan! 3!
Figure!2:!Development!Layout! 4!
Figure!3:!Conceptual!Treatment!Train! 6!
Figure!4:!Model!Layout! 9!
Figure!5:!WSUD!Strategy! 12!
Figure!6:!Detention!Strategy! 19!
!
!
TABLES!
!
Table!1:!Site!stormwater!quality!objectives!(operational!phase)! 5!
Table!2:!Impervious!Percentage! 7!
Table!3:!Catchment!Areas! 8!
Table!4:!MUSIC!Rainwater!Tank!Parameters! 10!
Table!5:!Bioretention!Basin!Design!Parameters! 11!
Table!6:!MUSIC!Results!–!LoadbBased!Pollutant!Outputs!–! 13!
Table!7:!!WBNM!SubbCatchment!Fraction!Impervious!Values!–!Existing!Scenario! 15!
Table!8:!!Existing!Scenario!WBNM!Outlet!Peak!Flows! 15!
Table!9:!Rational!Method!Calibration!Summary!(Total!Catchment)! 16!
Table!10:!Rational!Method!Peak!Flows!Versus!WBNM!Peak!Flows! 16!
Table!11:!!WBNM!SubbCatchment!Fraction!Impervious!Values!–!Developed!Scenario! 17!
Table!12:!!Developed!Scenario!WBNM!Outlet!Peak!Flows!–!Outlet!2! 17!
Table!13:!!Storage!and!Outlet!Details!of!Detention!System! 18!
Table! 14:! ! Comparison! of! Existing,! Developed! and! Mitigated! WBNM! Outlet! Peak! Flows! –!
Outlet!2! 18!
Table!15:!!Level!Spreader!Calculations! 20!
!
!
!
[OCR of page images]
aqua
FIGURES
Figure 1: Locality Plan 3
Figure 2: Development Layout 4
Figure 3: Conceptual Treatment Train 6
Figure 4: Model Layout 9
Figure 5: WSUD Strategy 12
Figure 6: Detention Strategy 19
TABLES
Table 1: Site stormwater quality objectives (operational phase) 5
Table 2: Impervious Percentage 7
Table 3: Catchment Areas 8
Table 4: MUSIC Rainwater Tank Parameters 10
Table 5: Bioretention Basin Design Parameters 11
Table 6: MUSIC Results — Load-Based Pollutant Outputs — 13
Table 7: WBNM Sub-Catchment Fraction Impervious Values — Existing Scenario 15
Table 8: Existing Scenario WBNM Outlet Peak Flows 15
Table 9: Rational Method Calibration Summary (Total Catchment) 16
Table 10: Rational Method Peak Flows Versus WBNM Peak Flows 16
Table 11: WBNM Sub-Catchment Fraction Impervious Values — Developed Scenario 17
Table 12: Developed Scenario WBNM Outlet Peak Flows — Outlet 2 17
Table 13: Storage and Outlet Details of Detention System 18
Table 14: Comparison of Existing, Developed and Mitigated WBNM Outlet Peak Flows —
Outlet 2 18
Table 15: Level Spreader Calculations 20
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
OPW16/0021- Operational Works Application 2 of 4Related documentApplication case desk ↗
About this file
- File size
- 21.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.