Skip to the record
Trusted by locals. Built for Noosa.

Council archive · source document

Decision Letter - Change to an Existing Approval - 010.2007.00001173.03 [As Published] · 142007.1173.03

of 21

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

   2007/1173




Page 13 of 21


[OCR of page images]
2007/1173

 

“ecoaccess a ope

~ environmental icences ‘and permits . =P
. : ~ Notice

ae Change | to an n existing approval

 

 

 

ae - 4, Speed Roof Boat Shed & Wharf - ‘Modified Jeties Layout s+ no

i . a A nae?

 

 

 

 

 

 

‘ a . ae

   

Meet ee ae abe >

. +
71. The works must ‘be undertaken in accordance with the plans indicated nap uk approved ‘plans .

     

4. Any material or ‘debris that falls or is deposited on tidal lands during thé works Pe be removed’ at the
naps 's cost and, expense ae to! the practical Gt biped of the eS

   
   
 

 

he ‘excess preservative prior to its use. "Contaminated ‘wash waters must’ not be deposited into tidal waters ol
cause coritamination to land. All treated timber must-be sawn or drifled over a catchment sheet or other: .
surface suitable to catch waste materials and the waste materials must. be disposed of to a licensed waste woo
facility. oe

7. All appropriate measures must be taken to prevent the pollution of tidal waters as a result of silt runoff,
oil and grease spills from machinery, concrete. truck washout and alike: Concrete agitator wash out must
only be conducted in a Specified area to facilitate the removal of waste concrete from the.area to landfill.
Wastewater from cleaning equipment shall not discharge directly or in-directly to any watercourse or
storinwater system. soe

 

: ay “ .
‘8. The following measures must be taken during the removal of the existing jetty and pontoon system:

 

_ (a) The demolished structures [piles, any pile stubs] and other debris located at the site must be
A completely removed an and all material Sisposed of above the level of highest Sonor i

tn

(b) Alt reasonable and ‘praéticable measures must be taken to preve nt ‘or, minimise damage. to’ oastal

         

   

fe a resources including’ that disturbance to the bed and,banks of the waterway is minimised tot ihe greatest:
, extent’practicable;, eA Be * ao) :

(0). The’ bed? ‘banks and immediate surrounds’ of the site are festored to’ their former Gondition as"
nearly as practicable and any excavation made is io ‘be completely backfilled to the existing bed level; oy
and“ ¢ aoe . : a

 

(d) Any material or any debris that falls or is deposited on tidal lands. during the demolition of the’ *
structure must be removed at the completion of the works.

9. The development must not result in a change in water chemistry that will impact on ecological values
on or off site.

10. A report from a Registered Professional Engineer of Queensland must be submitted to the Department:
of Environment.and Resource Management within three (3) months of thé date of completion of the works, .
certifying that:- . ; +

is “

aed a
Page 30f9- Abosot09, “ Department of Environment and Resource Management +
6 st nee

 

Page 13 of 21

Used in these records

About this file

File size
837 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Letter - Change to an Existing Approval - 010.2007.00001173.03 [As Published].pdf · 837 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.