Project Handover & Maintenance Manual – Fytogreen Australia Pty Ltd
However general mixing Instructions are summarised as follows:
Generally
Tank A Combi-sol 6+8+30+TE diluted at a rate of 40 grams per litre of water.
Mixed until Combi-sol is fully dissolved and a consistent solution is
achieved
Tank B Calcium Nitrate diluted at a rate of 20 grams per lire of water
Place some water in tank B, then in a separate container, add 5 litres of
hot water, into the hot water place required amount of Calcium Nitrate.
Stir until dissolved to a uniform solution, and then add to tank B.
(g) Fytowall Vertical Wall Garden Operating Components
Components with moving parts on a Fytowall Vertical Garden are as follows:
• Galcon GSI Irrigation Controller
• Hunter Master Solenoid valve with Flow Control.
• Dosatron Compact D Fertigation injector.
• Caleffi Pressure Reducing valve with Pressure Gauge.
• MV80 Solenoid valves for each irrigation zone
• Dual check valve
• Y strainer
• Ball valves (as required)
• Swing check valves (as required)
• Water meter with pulse output
It is essential that all parts and components are fully operational, checked and
maintained on a regular basis.
Project Handover & Maintenance Manual
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Green wall Handover Manual.2.pdfRelated documentApplication case desk ↗
About this file
- File size
- 301 KB (small file)
- File type
No other editions are linked here.