Council archive · source document
Green wall Handover Manual.2 · OPW16/0021
From the archive OPW16/0021- Response Landscape. File date in the archive: 2016-05-16 04:00.
Project Handover & Maintenance Manual – Fytogreen Australia Pty Ltd
(h) Plant and Growing Modules Inspection and Maintenance Matrix:
Area of Inspection Item Inspection Inspection Procedure as Necessary Action
Attention Frequency applicable to detailed/cursory (Recommend contact
inspections Fytogreen Australia Pty
Ltd)
Inspect each growing module
If damage to panels or
Check for physical damage to panel at close range for signs
surrounding cage structure
growing medium foam panels of damage to both the growing
are affecting plant growth
and any related adverse plant medium and surrounding cage
then repair or replace panel
growth problems structure as applicable to visit
type
Look for any sagging or Repair or replace panels
Check panel cages are well
drooping growing modules that cage or stainless steel
secured to vertical wall frame
may not be properly secured holding hooks if damaged
to the vertical frame.
Cursory
Inspection Push gently, using the index
required finger, on the top third and
6 times year bottom third of panel to see if
Repair of replace irrigation
/ from the water comes out easily. The
drip lines if damaged or
General ground or medium should neither be
Check for water volume in faulty
gardening ladder saturated or dry, however
growing medium
and review uniformly moist as
Adjust levels of irrigation if
of growing & demonstrated during the
panels excessively wet or
medium Fytogreen handover briefing /
excessively dry
modules Detailed training session
Inspections (Refer to Fytogreen Irrigation
required 4 Users Guide)
times a year Possibly remove struggling
Check general plant growth Cursory / detailed inspection
plant species or overplant
condition – are all or only of all plant species growing in
with another more suitable
some healthy panels as appropriate to visit
plant species
Check for weeds growing As Above Remove weeds
Remove the defeated plant
Check for dead plants As Above species and re-plant with
different species
Remove and clean affected
Check for signs of disease or
As Above species. If problem persists
pest damage
spray with insecticide
Check for uncontrolled or
Prune and remove excess
over-growth As Above
plant material.
Project Handover & Maintenance Manual
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Green wall Handover Manual.2.pdfRelated documentApplication case desk ↗
About this file
- File size
- 301 KB (small file)
- File type
No other editions are linked here.