Project Handover & Maintenance Manual – Fytogreen Australia Pty Ltd
(j) Drainage, Irrigation and Fertigation Individual Components Inspection and
Maintenance Items:
Necessary Action
Area of Inspection Inspection Procedure as applicable (Recommend contact
Inspection Item
Attention Frequency to detailed/cursory inspections Fytogreen Australia Pty
Ltd)
Check power / operation and run self Repair / Replace as
Galcon GSI Irrigation diagnostic test required if faulty; Call the
Controller (Refer to Fytogreen Irrigation Users Manufacturer for Technical
Guide) support)
Hunter Master Check that the solenoid valve is Repair / Replace as
Solenoid valve with regulating flow, (Listen for clicks required faulty
Flow Control sounding) open on actuation valve/component
Repair / Replace / clean
Checks leaking seals, suction tube
as required faulty / dirty
connections (no leaks) and that filter are
Dosatron Compact D valves/components
clean. Check bypass valve for correct
Fertigation injector Inspections Call “Dosatron”
operation (Listen for clicking noise of
required 6 Manufacturer for Technical
pump during operation)
times a year support)
Check static / operational pressuring
“Caleffi” Pressure Inspect / clean / replace as
Automated on valve (should read 350kpa –
Reducing valve with per manufactures
Irrigation & (Refer to Fytogreen Irrigation Users
Pressure Gauge Instructions
Fertigation unit Guide)
individual MV80 Solenoid Check operation and run self Inspect / replace with equal if
components valves for each diagnostic test via Irrigation damaged or faulty (Refer
irrigation zone Controller specification sheet)
Check for correct operation during Inspect / replace with generic
Dual check valve and after normal operation (should valve if damaged or faulty
be no leaks) (refer general spec sheet)
Ball valves As above As above
Y strainer Unscrew, check port, check filter,
As above
should appear in clean condition
Swing check valves As above As above
Check for leaks, correct readings / Inspect / replace as required
Water meter with output by performing a general damaged or faulty units
pulse output operations test (Refer to Fytogreen (Call BES - Manufacturer
Irrigation Users Guide) for Technical support)
Project Handover & Maintenance Manual
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Green wall Handover Manual.2.pdfRelated documentApplication case desk ↗
About this file
- File size
- 301 KB (small file)
- File type
No other editions are linked here.