Council archive · source document
Green wall Handover Manual.2 · OPW16/0021
From the archive OPW16/0021- Response Landscape. File date in the archive: 2016-05-16 04:00.
Project Handover & Maintenance Manual – Fytogreen Australia Pty Ltd
(i) Drainage, Irrigation and Fertigation System General Inspection and Maintenance
Items:
Necessary Action
Inspection Inspection Procedure as applicable (Recommend contact
Area of Attention Inspection Item
Frequency to detailed/cursory inspections Fytogreen Australia Pty
Ltd)
Check all drainage points for
accumulation of fallen debris,
Check all drainage Remove and clean
leaves and weeds at all drainage
points drainage points
points throughout the Fytowall
system
Automated Inspection
Irrigation & required 10
Check for leaks or overflows of Repair or replace drainage
Fertigation unit Drainage tray times a year
drainage trays tray if damaged or faulty
and System
Generally Irrigation drip-line Check for blocks or breaks in the
primary connection irrigation hose by conducting Repair or replace faulty
points at low level general irrigation test hose sections
Hydroponic nutrient Check levels of hydroponic Replenish hydroponic
solution nutrient solution nutrient solution if required
Project Handover & Maintenance Manual
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Green wall Handover Manual.2.pdfRelated documentApplication case desk ↗
About this file
- File size
- 301 KB (small file)
- File type
No other editions are linked here.