Skip to the record
Noosa's #1 Council Tracker.

Council archive · source document

Green wall Handover Manual.2 · OPW16/0021

From the archive OPW16/0021- Response Landscape. File date in the archive: 2016-05-16 04:00.

of 19

Text shows just the words. Original shows the document exactly as it was published.

Project Handover & Maintenance Manual – Fytogreen Australia Pty Ltd




APPENDIX B




FYTOWALL VERTICAL WALL
GARDEN    COMPONENT    SPECIFICATION
LITERATURE
            1. GALCON GSI IRRIGATION CONTROLLER
            2. HUNTER MASTER SOLENOID VALVE WITH FLOW CONTROL.
            3. DOSATRON COMPACT D FERTIGATION INJECTOR.
            4. CALEFFI PRESSURE REDUCING VALVE WITH PRESSURE GAUGE.
            5. DUAL CHECK VALVE
            6. Y STRAINER
            7. SWING CHECK VALVES (AS REQUIRED)
            8. WATER METER WITH PULSE OUTPUT




                       Project Handover & Maintenance Manual

Used in these records

About this file

File size
301 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Green wall Handover Manual.2.pdf · 301 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.