Council archive · source document
Green wall Handover Manual.2 · OPW16/0021
From the archive OPW16/0021- Response Landscape. File date in the archive: 2016-05-16 04:00.
Project Handover & Maintenance Manual – Fytogreen Australia Pty Ltd
APPENDIX C
FYTOWALL VERTICAL WALL
GARDEN USERS IRRIGATION GUIDE
Irrigation Control Settings
Caleffi Pressure Reducer Settings -Static Pressure 240 kPa
- Operating Pressure 180 kPa
Current Programmed Runtimes (mins)
Start Time Zone 0 Zone 1 Start Time Zone 0 Zone 1 Start Time Zone 0 Zone 1
7.00 4 min 4 min 11.00 4 min 4 min 15.00 4 min 4 min
8.00 4 min 4 min 12.00 4 min 4 min 16.00 4 min 4 min
9.00 4 min 4 min 13.00 4 min 4 min 17.00 4 min 4 min
10.00 4 min 4 min 14.00 4 min 4 min 18.00 4 min 4 min
Site Notes
If litres per cycle start to drop dramatically during runtimes, immediately refer to
pressure gauge in irrigation cabinet to ensure correct readings. Run a program to
check operating pressure and general system. If operating pressure is low,
immediately contact site plumber.
Project Handover & Maintenance Manual
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Green wall Handover Manual.2.pdfRelated documentApplication case desk ↗
About this file
- File size
- 301 KB (small file)
- File type
No other editions are linked here.