Noosa on Weyba
Stormwater Management Plan
The WSUD features proposed for the site will be modelled with MUSIC to ensure these WQOs are met.
In addition the pollutant load from the site will be compared to the existing case, using MUSIC, to ensure that
the pollutant load from the site is not being increased.
Frequent Flow Management
The impervious percentage of the developed areas is greater than 40 percent. Therefore it is required to
capture and manage the first 15mm/day of runoff from all impervious surfaces. The storage volume should
be able to drain within 24 hours.
Waterway Stability
Limit the post-development peak 1 year ARI event discharge within the receiving waterway to the pre-
development peak 1 year ARI event discharge.
5.2 Noosa River Environmental Values and Water Quality Objectives
According to DEHP’s Noosa River Environmental Values and Water Quality Objectives (July, 2010) Lake
Weyba is located in area NME1 – Noosa Lakes (middle estuary) and the following environmental values
apply:
Aquatic Ecosystems
Seagrass
Human Consumer
Primary Recreation
Secondary Recreation
Visual Recreation
Cultural and Spiritual Values
th th
The applicable water quality objectives for Lake Weyba are to maintain the existing water quality (20 , 50
th
and 80 percentiles), which are:
Turbidity: 2 – 5 – 8 NTU
Suspended Solids (TSS): 20 – 20 – 20 mg/L
Chlorophyll a: 0.8 – 1.5 – 2.5 µg/L
Total Nitrogen (TN): 150 – 240 – 380 µg/L
Oxidised N: 2 – 5 – 15 µg/L
Ammonia N: 7 – 15 – 32 µg/L
Organic N: 130 – 210 – 320 µg/L
Total Phosphorous (TP): 10 – 13 – 16 µg/L
Filterable Reactive Phosphorous (FRP): 2 – 2 – 2 µg/L
Dissolved Oxygen: 85 – 95 – 105% saturation
pH: 8.0 – 8.2 – 8.3
Secchi depth: 1.1 – 1.6 – 2.0 m
Eenie Creek and Keyser Creek are classified as wallum/tannin stained streams and the applicable water
quality objectives are:
Turbidity: <20 NTU
Suspended Solids (TSS): <6 mg/L
Northbrook Corporation Pty Ltd Version 4 16 September 2013
SMP_v4.docx Commercial in Confidence Page 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 16- Amended Stormwater Management Plan MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 10.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.