Attachment 16- Amended Stormwater Management Plan MCU12/0208
Plans and drawings: the text below has words only, no drawings.
Noosa on Weyba
Stormwater Management Plan
Chlorophyll a: <5 µg/L
Total Nitrogen (TN): <500 µg/L
Oxidised N: <60 µg/L
Ammonia N: <20 µg/L
Organic N: <420 µg/L
Total Phosphorous (TP): <50 µg/L
Filterable Reactive Phosphorous (FRP): <20 µg/L
Dissolved Oxygen: 85 –110% saturation
pH: 5.0 – 7.0
Secchi depth: n/a
Conductivity: 500 µS/cm
5.3 Water Quality Monitoring
Healthy Waterways undertakes regular monitoring of water quality within Lake Weyba under their Ecosystem
Health Monitoring Program. The observed water quality from 2002, compared to the above objectives is
shown in Appendix B. The observed water quality for turbidity, chlorophyll a, TN, ammonia N, organic N and
secchi depth currently do not meet the DEHP objectives. It should be noted that the target secchi depths are
greater than the average depths of Lake Weyba.
MUSIC modelling will be used to determine the reduction in pollutant loads for the operational phase of
development. This is the approach recommended by DEHP to determine whether proposed treatment
devices will be sufficient. The resultant pollutant concentrations in the MUSIC modelling will be dependent
on the assumed default background concentrations within the treatment devices, which are in some
instances higher than the WQOs. For example the background TP concentration in bio-retention systems is
assumed to be 130 µg/L and the water quality objective is 50 µg/L. It is therefore not possible to show
through MUSIC modelling that concentration based WQOs can be met.
The SCRC RFI has suggested that site specific monitoring be carried out, as Healthy Waterways monitoring
may not be able to be relied upon for the life of the development. A site specific water quality monitoring
program has therefore been proposed for the construction and operational phases of the development, the
details of which are summarised below. The locations of the proposed monitoring sites are shown in
Appendix B. Baseline monitoring prior to the start of construction will be used to help define the existing
water quality objectives.
At the start of the water quality monitoring photos of each site should be taken, so that it easier to ensure the
same location is used for monitoring. The monitoring should occur with a calibrated hand held instrument,
with the remaining physico-chemical parameters sent to a laboratory for analysis. The testing should ideally
be conducted at the same time of day, as some parameters such as pH and dissolved oxygen vary through
the day. The water quality monitoring should allow sufficient time after a high flow event to allow conditions
to stabilise.
The adopted water quality monitoring sites are summarised below. They were chosen to determine the
incoming water quality and the potential impact of development.
Site A: Located upstream location of development, and downstream of neighbouring golf course.
Site B: Located in existing dam within Lot 53.
Site C: Located in Eenie Creek 350m upstream of Walter Hay Drive, downstream of neighbouring Lake
Entrance Boulevard residential area and downstream of part of the proposed development.
Site D: Located in Eenie Creek 280m downstream of Walter Hay Drive, downstream of Noosa Civic
development and part of the proposed development.
Northbrook Corporation Pty Ltd Version 4 16 September 2013
SMP_v4.docx Commercial in Confidence Page 9
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 16- Amended Stormwater Management Plan MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 10.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.