Skip to the record
Accept no substitutions.

Council archive · source document

Attachment 16- Amended Stormwater Management Plan MCU12/0208

of 66

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
Noosa on Weyba
Stormwater Management Plan



     Coarse sediment forebays on the inlet point.
     Batters should be densely vegetated to deter pedestrian/vehicle access. The batter slope should be at
      least 1 in 2.
     Inorganic mulch laid over the filter media surface improves moisture retention. The mulch used should
      not float during rainfall.
     The overflow pit invert will be 150 mm above the base to provide for extended detention. The total
      depth of the bio-retention garden will be around 250 mm to prevent ponding within the road.
     Litter baskets should be installed on the overflow pits.
     Clean out points should be provided for all underdrainage.
     A flat pedestrian refuge area of around 300mm width should be provided along the boundary with the
      road.
A typical bio-retention garden cross-section is shown below in Image 2 and an example is shown in Image 3.




Image 2        Typical Bio-retention Garden (Water Sensitive Urban Design: Streetscape Planning and
               Design Package, Brisbane City Council, 2011)




Image 3        Bio-retention Garden

6.2.4          Bio-retention Swales
Bio-retention swales are similar to bio-retention basins, except that they are long and narrow systems with
no extended detention depth. They have a shallow longitudinal grade of 2 percent or less. Field inlets are
located along the length of the swale to drain excess flows. Litter baskets should be installed on all field
inlets.


Northbrook Corporation Pty Ltd                      Version 4                               16 September 2013
SMP_v4.docx                                   Commercial in Confidence                               Page 16

Used in these records

About this file

File size
10.0 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 16- Amended Stormwater Management Plan MCU12_0208.pdf · 10.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.