Table 7-2           Rainwater Tank Details

  Catchment Name                               Rainwater Tank
                                 Total Size       Irrigation              Indoor Use
                                    (kL)          (kL/year)                 (kL/day)

         1_B_1                      170            1956.7                   2.237
         1_B_2                      210            2417.1                   2.764
         1_B_3                      90             1035.9                   1.184
         1_B_4                      130            1496.3                   1.711
         1_B_5                      130            1496.3                   1.711
         1_C_1                      120            1697.3                   4.000
         1_D_1                      415            5251.1                   7.802
         1_E_1                      600            4261.5                   11.280
         2_F_1                      400            3604.0                   5.264
         2_G_1                     1240            11172.4                  16.318
         3_H_1                      60              814.8                   1.128
         3_H_2                      140            1611.2                   1.955
         3_H_3                      290            3337.5                   4.042
         3_H_4                      150            1351.5                   1.974
         3_I_1                      520            4685.2                   6.843
         3_I_2                      350            3153.5                   4.606
         3_I_3                      470            4234.7                   6.185
         3_I_4                      570            5135.7                   7.501
         3_I_5                      120            1081.2                   1.579
          4_K                       60              690.6                   0.790
              4_L                   500            6005.4                   9.400



7.3.2               Bio-retention Basins and Bio-retention Gardens
The bio-retention basins were set up using the Healthy Waterways MUSIC Modelling Guidelines. The filter
area and surface area were assumed to be the same, so as to allow for future changes in the batter design.
This is a conservative assumption as it underestimates the storage volume available. The indicative sizes of
the basins shown in Figures 3, 4 and 5 allow for a depth of 1 metre and a batter slope of 1 in 4. The bio-
retention/detention basins assumed a depth of 1.5 metres. Sufficient area for coarse sediment forebays and
field inlets was also provided.
A saturated hydraulic conductivity of 200 mm/hr was assumed. This is typical of sandy loam filter media.
The TN content of the filter media was assumed to be 800 mg/kg. The orthophosphate content was
assumed to be 50 mg/kg. The bio-retention devices were assumed to be planted with effective nutrient
removal plants.
A sensitivity analysis was conducted where the saturated hydraulic conductivity was reduced to 50 mm/hr, to
determine the potential impact of filter blockage.
No exfiltration was assumed. The overflow width was assumed to be one tenth of the surface area as
recommended by the guidelines.
The extended detention depth of the bio-retention basins was assumed to be 0.3 metres. The extended
detention depth for bio-retention gardens was assumed to be 0.15 metres.
The bio-retention gardens in each sub-area were combined into the one treatment node.

Northbrook Corporation Pty Ltd                       Version 4                              16 September 2013
SMP_v4.docx                                    Commercial in Confidence                              Page 20

Used in these records

About this file

File size
10.0 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 16- Amended Stormwater Management Plan MCU12_0208.pdf · 10.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.