Table 7-2 Rainwater Tank Details
Catchment Name Rainwater Tank
Total Size Irrigation Indoor Use
(kL) (kL/year) (kL/day)
1_B_1 170 1956.7 2.237
1_B_2 210 2417.1 2.764
1_B_3 90 1035.9 1.184
1_B_4 130 1496.3 1.711
1_B_5 130 1496.3 1.711
1_C_1 120 1697.3 4.000
1_D_1 415 5251.1 7.802
1_E_1 600 4261.5 11.280
2_F_1 400 3604.0 5.264
2_G_1 1240 11172.4 16.318
3_H_1 60 814.8 1.128
3_H_2 140 1611.2 1.955
3_H_3 290 3337.5 4.042
3_H_4 150 1351.5 1.974
3_I_1 520 4685.2 6.843
3_I_2 350 3153.5 4.606
3_I_3 470 4234.7 6.185
3_I_4 570 5135.7 7.501
3_I_5 120 1081.2 1.579
4_K 60 690.6 0.790
4_L 500 6005.4 9.400
7.3.2 Bio-retention Basins and Bio-retention Gardens
The bio-retention basins were set up using the Healthy Waterways MUSIC Modelling Guidelines. The filter
area and surface area were assumed to be the same, so as to allow for future changes in the batter design.
This is a conservative assumption as it underestimates the storage volume available. The indicative sizes of
the basins shown in Figures 3, 4 and 5 allow for a depth of 1 metre and a batter slope of 1 in 4. The bio-
retention/detention basins assumed a depth of 1.5 metres. Sufficient area for coarse sediment forebays and
field inlets was also provided.
A saturated hydraulic conductivity of 200 mm/hr was assumed. This is typical of sandy loam filter media.
The TN content of the filter media was assumed to be 800 mg/kg. The orthophosphate content was
assumed to be 50 mg/kg. The bio-retention devices were assumed to be planted with effective nutrient
removal plants.
A sensitivity analysis was conducted where the saturated hydraulic conductivity was reduced to 50 mm/hr, to
determine the potential impact of filter blockage.
No exfiltration was assumed. The overflow width was assumed to be one tenth of the surface area as
recommended by the guidelines.
The extended detention depth of the bio-retention basins was assumed to be 0.3 metres. The extended
detention depth for bio-retention gardens was assumed to be 0.15 metres.
The bio-retention gardens in each sub-area were combined into the one treatment node.
Northbrook Corporation Pty Ltd Version 4 16 September 2013
SMP_v4.docx Commercial in Confidence Page 20
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 16- Amended Stormwater Management Plan MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 10.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.