Noosa on Weyba
Stormwater Management Plan



    Catchment     Total Area              Roof                              Road                     Ground
      Name           (ha)         Area       Percent Im-          Area         Percent Im-   Area        Percent Im-
                                  (ha)        pervious            (ha)          pervious     (ha)         pervious
                                                 (%)                               (%)                       (%)
      2_F_1          3.240        0.860            100           1.005             60        1.375            35
      2_G_1          8.273        2.666            100           1.995             60        3.612            30
      2_G_2          0.716                                       0.716             60
      3_H_1          0.607        0.212            100           0.182             60        0.212            30
      3_H_2          1.049        0.298            100           0.364             60        0.387            35
      3_H_3          1.963        0.618            100           0.476             60        0.869            36
      3_H_4          1.981        0.323            100           0.620             60        1.038            48
      3_H_5          1.190                                       1.190             60
      3_I_1          4.018        1.118            100           0.906             60        1.994            38
      3_I_2          2.891        0.723            100           0.596             60        1.572            42
      3_I_3          3.427        1.011            100           0.634             60        1.782            37
      3_I_4          5.242        1.226            100           1.707             60        2.309            39
      3_I_5          1.147        0.258            100           0.294             60        0.595            43
        4_K          0.665        0.150            100           0.154             60        0.361            43
        4_L          4.473        1.566            100           1.342             60        1.566            30


Area J is a large rural residential lot. The layout for this area has not yet been defined, but the developed
area is likely to only take up a small part of the area. The most suitable treatment measures will be
determined when this area has been more clearly defined. It is likely that the most appropriate treatment
measures would be rainwater tanks and vegetated swales.
Area A has not been included in the modelling as it is the renovation of an existing building. However, it is
recommended that larger rainwater tanks be installed in this area to reduce the potable water demand.

7.3             Treatment Devices

7.3.1           Rainwater Tanks
The rainwater tanks were set up using the Healthy Waterways MUSIC Modelling Guidelines. It was
assumed that a 10 kL tank would be provided for each residential lot and a 5 kL tank would be provided for
each townhouse or retirement villa. For the proposed apartment buildings a 120 kL tank was used. A
sensitivity analysis will be conducted to determine the impact of only providing half of this tank size.
The rainwater tank usage rates assumed that full water saving devices would be adopted (i.e. 21 L/p/day for
toilet flushing and 26 L/p/day for laundry). The following occupancy rates were assumed:
     2.8 people per residential lot;
     2.0 people per townhouse or retirement villa; and
     1.7 people per apartment.
For outdoor uses it was assumed that 70 percent of the ground area would be irrigated at 548 mm/year,
which is the rate recommended for private gardens (refer MUSIC Guidelines). The ground area was
                     2                                     2
assumed to be 300 m for premium residential lots and 235 m for standard residential lots. For the other
types of development the ground area was taken from the MUSIC model sub-catchment area. The outdoor
use was scaled by PET and rainfall. Therefore on days where there is sufficient rainfall no irrigation would
be applied.
The details of each rainwater tank are shown in Table 7-2.

Northbrook Corporation Pty Ltd                         Version 4                                      16 September 2013
SMP_v4.docx                                      Commercial in Confidence                                      Page 19

Used in these records

About this file

File size
10.0 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 16- Amended Stormwater Management Plan MCU12_0208.pdf · 10.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.