Attachment 16- Amended Stormwater Management Plan MCU12/0208
Plans and drawings: the text below has words only, no drawings.
Noosa on Weyba
Stormwater Management Plan
If the filter media hydraulic conductivity reduces from 200 mm/hr to 50 mm/hr the WQOs are not met.
However, it should be noted that a significant reduction in pollutant loads, close to the WQO targets, is still
achieved and the resultant pollutant load would still be less than the existing case. Proper maintenance of
the filter media will be required to ensure that the hydraulic conductivity does not significantly reduce over
time.
If only half of the tank size is implemented then the WQOs are still met for all pollutants, for the site as a
whole. Therefore if necessary, the QDC minimum size tanks could be adopted on site. It should be noted
that for Areas C, F, G and K the TN WQO is not met. It is therefore recommended that these precincts adopt
the larger tank sizes or increase the bio-retention treatment areas. The proposed tank sizes supply around
82 percent of the non-potable water demand. If the tank sizes are halved this reduces to around 66 percent.
The larger tank sizes therefore supply an additional 23 ML/yr of non-potable water. Non-potable water
demand is generally estimated to be around 65 percent of the total water demand. Therefore around 53
percent of the total water demand of the site can be supplied by rainwater tanks. It is therefore
recommended that the proposed larger tank sizes be maintained so that the water demand of the site is
minimised. It should be noted that irrigation of park areas outside of the precinct areas has not been
assumed in the MUSIC modelling. The larger tank sizes will potentially also allow for irrigation of these
areas, therefore further reducing the water demand of the site.
The proposed bio-retention gardens will have the rainwater tank overflow directly connected to underground
drainage. This was found to improve the hydraulic efficiency of the bio-retention gardens as it allows them to
better treat the runoff from the road and ground nodes. A sensitivity analysis was conducted to determine
the impact of having rainwater tank overflow draining to the kerb. The results show that for the site as a
whole that the WQOs are still met. For the effected precincts there was a reduction in the removal of TSS
and TP below the WQO and an improvement in the TN removal. It is therefore recommended that these
areas maintain the direct connection to underground drainage. However, if this is not possible in some
areas, the WQOs for the site as a whole are still met if tank overflow is directed to the kerb.
Table 8-3 Sensitivity Analysis Results
Pollutant Percentage Load Removal
(%)
WQO Developed With Filter Half Tank Roof to Bio
Case Blockage Size Gardens
Total Suspended Solids (TSS) 80.0 82.2 77.5 81.7 80.8
Total Phosphorous (TP) 60.0 63.2 59.2 62.1 62.6
Total Nitrogen (TN) 45.0 51.9 42.5 49.9 53.3
Gross Pollutants (GP) 90.0 100.0 100.0 100.0 100.0
The impact of community education, bio-retention tree pits, litter baskets, buffer areas and rehabilitation of
the waterway corridors has not been included in the MUSIC modelling, unless stated otherwise. Therefore
the MUSIC results are a conservative assessment of the improvement in stormwater quality that can be
achieved on site.
8.3 Without Rainwater Tanks
As part of the response to the SCRC RFI the impact of not having rainwater tanks as part of the treatment
train was assessed. The State Government has amended the QDC, and there is now no requirement to
have rainwater tanks.
The MUSIC analysis was therefore re-run to determine the increase in bio-retention treatment size that
would be required to compensate for the loss of the rainwater tanks. As the proposed development has
targeted a higher level of treatment than typically required the increase required was not as significant as
that necessary for similar developments. It was found that if the bio-retention filter media area in the basins
and swales was increased by 25 percent, then the WQOs could be met. The exception was for areas F and
G, where a 50 percent increase in the bio-retention gardens was required. It would also be necessary to
Northbrook Corporation Pty Ltd Version 4 16 September 2013
SMP_v4.docx Commercial in Confidence Page 25
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 16- Amended Stormwater Management Plan MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 10.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.