Noosa on Weyba Stormwater Management Plan drain the roof areas to the road, rather than directly to underground drainage. The resultant load removal for the combined site was 83% for TSS, 60% for TP and 48% for TN. While the water quality objectives can be met if the bio-retention areas are increased it is still recommended that rainwater tanks be adopted on site. The proposed development aims to promote the use of ecologically sensitive design and the use of rainwater tanks plays an important role in this regard. As this will be a Body Corporate development there will be more control available on the development conditions for each lot. The use of rainwater tanks will significantly reduce the water demand of the site and allow the remaining treatment devices to be better utilised treating ground and road runoff, rather than relatively clean roof runoff. 8.4 Frequent Flow Objective The developed area of the site is 56.36 hectares, and is on average 62.5 percent impervious. The first 15 mm of runoff from impervious surfaces is therefore 5.28 ML/day. Based on the 10 years of rainfall data used in the MUSIC modelling, the average annual runoff from the first 15mm of runoff from impervious surfaces is equivalent to 317.2 ML/year. The total average annual runoff was 607.8 ML/year. The MUSIC model was used to determine how much of the runoff was being treated by the bio-retention basins and swales. The rainwater tanks were removed from the modelling, so that there were no other outflows. The amount of runoff being treated by the bio-retention basins and swales alone was 364.7 ML/year. This is greater than the amount of runoff generated from the first 15mm of rainfall from impervious surfaces, and therefore the frequent flow objectives are met. The proposed rainwater tanks have a total volume of 6.375 ML. The daily usage is on average 0.282 ML/day, or 103.1 ML/year. The proposed tanks supply around 84.5 ML/year of this non-potable demand. Therefore the total flow being treated or removed will be greater than that modelled without the rainwater tanks in place. 8.5 Waterway Stability The waterway stability objective is met as the peak flows from the site have been reduced to existing case levels for all ARI events up to and including the 100 year ARI event (refer Flood Study, Cardno, September 2013). This is due to the attenuation being provided by the proposed road crossings and detention basins. The attenuation provided by the rainwater tanks and bio-retention basins was not included in this analysis. Therefore the attenuation, particularly for minor events, will likely be greater than reported. Bio-retention basins and rainwater tanks provide some attenuation of minor peak flows, typically up to the 2 year ARI event. The stormwater outlets throughout the site should have adequate scour protection installed to prevent downstream erosion. Northbrook Corporation Pty Ltd Version 4 16 September 2013 SMP_v4.docx Commercial in Confidence Page 26
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 16- Amended Stormwater Management Plan MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 10.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.