Noosa on Weyba
Stormwater Management Plan




9              Conclusion

Due to the ecologically sensitive location of the site, appropriate stormwater quality treatment is of the
upmost importance. For this reason the best available stormwater treatment measures have been proposed.
The proposed WSUD strategy for the site includes:
     Community education.
     Reducing potable water demand through use of water efficient devices and appliances.
     Large rainwater tanks (around twice the former QDC size requirements) connected to all practically
      available roof area to maximise rainwater harvesting, reduce stormwater flows and reduce potable
      water demand.
     Bio-retention basins.
     Bio-retention gardens within the road reserve.
     Bio-retention tree pits within the road reserve.
     Bio-retention swales.
     Vegetated swales.
     Litter baskets.
     Buffer areas.
     Revegetation and rehabilitation of Lake Weyba buffer area.
     Rehabilitation of Keyser Creek waterway corridor.
     Reticulated water and sewerage, which will minimise the risk of contaminants from effluent being
      discharged into Lake Weyba.
The proposed development will maximise the use of alternative sources of water. The proposed rainwater
tanks will be able to provide around 82 percent of the non-potable water demand and around 53 percent of
the total water demand of the site.
MUSIC modelling has shown that the water quality objectives and frequent flow objectives for the site can be
met. The reduction in pollutant loads being achieved by the proposed stormwater treatment train is
significantly greater than the reduction typically provided by standard residential developments.
The resultant pollutant loads from developed areas of the site are less than those resulting from the existing
rural use of these areas, based on the pollutants modelled. Other areas of the site will be converted from
rural uses to park areas and densely vegetated areas will become designated conservation areas, and
rehabilitated as required. Therefore the overall stormwater quality being discharged from the site will likely
be improved, and there will not be an impact on the water quality of Lake Weyba.
Regular water quality monitoring will be used to ensure that stormwater being discharged from site is of
suitable quality. Baseline monitoring will be used to determine the existing water quality.




Northbrook Corporation Pty Ltd                       Version 4                               16 September 2013
SMP_v4.docx                                    Commercial in Confidence                               Page 27

Used in these records

About this file

File size
10.0 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 16- Amended Stormwater Management Plan MCU12_0208.pdf · 10.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.