Council archive · source document
Attachment 16- Amended Stormwater Management Plan MCU12/0208
Plans and drawings: the text below has words only, no drawings.
Noosa on Weyba Stormwater Management Plan Tables Table 5-1 Water Quality Monitoring Parameters ......................................................................................... 11 Table 5-2 Water Quality Testing Results..................................................................................................... 12 Table 7-1 MUSIC Sub-catchments .............................................................................................................. 18 Table 7-2 Rainwater Tank Details ............................................................................................................... 20 Table 7-3 Bio-retention Basin and Bio-retention Garden Details ................................................................ 21 Table 7-4 Bio-retention Node Details .......................................................................................................... 22 Table 7-5 Swale Node Details ..................................................................................................................... 22 Table 7-6 Vegetated Swale Details ............................................................................................................. 22 Table 8-1 Pollutant Load Reductions .......................................................................................................... 24 Table 8-2 Comparison to Existing Case ...................................................................................................... 24 Table 8-3 Sensitivity Analysis Results ......................................................................................................... 25 Figures Figure 1 Site Location Figure 2 Sub-catchments Figure 3 Proposed Stormwater Treatment – Areas A to G Figure 4 Proposed Stormwater Treatment – Areas H and I Figure 5 Proposed Stormwater Treatment – Areas J to L Appendices Appendix A Concept Masterplan Appendix B Water Quality Monitoring Appendix C Community Information Leaflet Appendix D Underground Rainwater Tank Example Appendix E MUSIC Model Layouts Appendix F Maintenance Plan Appendix G Response to Information Request Northbrook Corporation Pty Ltd Version 4 16 September 2013 SMP_v4.docx Commercial in Confidence Page iv
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 16- Amended Stormwater Management Plan MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 10.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.