Skip to the record
Mmm.. taste the original NoosaWatch™

Council archive · source document

Attachment 16- Amended Stormwater Management Plan MCU12/0208

of 66

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
Noosa on Weyba
Stormwater Management Plan




Tables
Table 5-1      Water Quality Monitoring Parameters ......................................................................................... 11
Table 5-2      Water Quality Testing Results..................................................................................................... 12
Table 7-1      MUSIC Sub-catchments .............................................................................................................. 18
Table 7-2      Rainwater Tank Details ............................................................................................................... 20
Table 7-3      Bio-retention Basin and Bio-retention Garden Details ................................................................ 21
Table 7-4      Bio-retention Node Details .......................................................................................................... 22
Table 7-5      Swale Node Details ..................................................................................................................... 22
Table 7-6      Vegetated Swale Details ............................................................................................................. 22
Table 8-1      Pollutant Load Reductions .......................................................................................................... 24
Table 8-2      Comparison to Existing Case ...................................................................................................... 24
Table 8-3      Sensitivity Analysis Results ......................................................................................................... 25



Figures
Figure 1       Site Location
Figure 2       Sub-catchments
Figure 3       Proposed Stormwater Treatment – Areas A to G
Figure 4       Proposed Stormwater Treatment – Areas H and I
Figure 5       Proposed Stormwater Treatment – Areas J to L



Appendices
Appendix A         Concept Masterplan
Appendix B         Water Quality Monitoring
Appendix C         Community Information Leaflet
Appendix D         Underground Rainwater Tank Example
Appendix E         MUSIC Model Layouts
Appendix F         Maintenance Plan
Appendix G         Response to Information Request




Northbrook Corporation Pty Ltd                                   Version 4                                                         16 September 2013
SMP_v4.docx                                                Commercial in Confidence                                                          Page iv

Used in these records

About this file

File size
10.0 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 16- Amended Stormwater Management Plan MCU12_0208.pdf · 10.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.