1 Introduction
This report has been updated in response to the Request for Information (RFI) from Sunshine Coast
th
Regional Council dated 28 February 2013. The responses to this request are contained within the report.
We have provided an index in Appendix G, which locates the responses to the relevant RFI items within the
report for ease of reference.
The subject site, known as Noosa on Weyba, encompasses the following lots:
The Northbrook Pty Ltd land:
Lot 1667 on M3772 44.4 ha
Lot 11 on RP893393 40.7 ha
Lot 12 on RP893393 0.61 ha
The J & K Hofmann land:
Lot 7 on RP46782 1.99 ha
Lot 2 on RP160983 93.1 ha
Lot 2 on SP179590 12.5 ha
Lot 53 on SP163571 110.0 ha
It is proposed to develop around 19 percent of this site for residential purposes, with 4 percent of the site
used as parks and lake buffer zone and the remaining 77 percent of site dedicated as greenspace and
conservation areas. The developed areas are contained within Lot 11 and 12 on RP893392, Lot 2 on
SP179590 and Lot 53 on SP163571. The concept master plan for the development is shown in Appendix A.
The development will be conducted under a Community Title Scheme.
The concept master plan has been modified slightly since stormwater quality modelling contained in this
report was completed. As the stormwater treatment strategy has not been changed and detailed stormwater
quality modelling will be required at the detailed design stage it is was not considered necessary to update
the stormwater quality modelling.
The site ultimately drains to Lake Weyba, which is a declared Fish Habitat Area. A section of the site is also
located in the Water Resource Catchment Area as defined by the Maroochy Plan 2000. Therefore the
treatment of stormwater to the best possible standard is of the upmost importance. A significant portion of
the site is currently used for rural purposes, in particular the grazing of cattle. Consequently the
development provides an opportunity to improve the quality of stormwater being discharged from the site if
appropriate measures are adopted.
To ensure that the impact of the development is minimised, the principles of water sensitive urban design
(WSUD) have been adopted. These principles (sourced from Urban Stormwater Planning Guidelines
Queensland Department of Environment and Heritage Protection (DEHP), 2010) include:
the protection of existing natural water features;
the integration of public open space with stormwater drainage corridors to maximise public access and
recreation and preserve waterway habitats and wildlife corridors;
the maintenance of the natural hydrologic behaviour of catchments by preserving the natural water
cycle;
the protection of water quality environmental values;
the minimisation of the demand on the reticulated water supply system and utilisation of stormwater as
a valued resource;
the minimisation of capital and maintenance costs of stormwater infrastructure; and
Northbrook Corporation Pty Ltd Version 4 16 September 2013
SMP_v4.docx Commercial in Confidence Page 1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 16- Amended Stormwater Management Plan MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 10.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.