STORMWATER QUALITY


The following are the responses to SCRC RFI (DW008:MCU12/0208) received on the 28th of February 2013.
Item 90
Issues
The Stormwater Management Plan (Cardno (Qld) Pty Ltd, Stormwater Management Plan, Job Ref.
5101/19-03) has been evaluated and the following are the concerns that need to be addressed prior to
any approval.
   There are concerns regarding the location of bio-retention devices in the proposed buffer to Lake
Weyba on lot 11 where 10 metres of the proposed 50 metre wide buffer will be used for these
devices. This also applies to other areas associated with the proposal where bio-retention devices
are proposed to be located in rehabilitated waterway buffer and open space areas.
The role that elements such as bio-retention basins and swales play in increasing the effectiveness of
wetland buffers is specifically recognised in the Queensland Wetland Buffer Planning Guideline (DERM,
2011) and other relevant planning guidelines. The location of these elements has been situated to ensure
that they do not impact on areas of ecological significance. As stated in the Stormwater Management Plan
(Cardno, September 2013) the proposed lake buffer width is 40 metres and the stormwater treatment zone is
an additional 10 metres. Existing trees within this zone will not be removed.
All stormwater treatment devices will be located outside of the 100 year ARI extent of inundation. The
development plans have been amended to ensure that the proposed stormwater treatment devices within
the development footprint.


   MUSIC modelling has been carried out on the assumption that rainwater storage tanks will be
installed onsite. This may be the intention at this point in time however State Government is
amending the QDC to remove the mandatory requirement for these tanks. Furthermore, the
Government may not allow local authorities to pursue this requirement through their planning
instruments. It is envisaged that as a minimum, the local authority requiring storage tanks for a
proposed development will need to at least justify this requirement.
MUSIC modelling therefore needs to be carried out based on the assumption that no rainwater
storage tanks will be installed on each lot.
Section 8.3 addresses this item.
The MUSIC analysis was re-run to determine the increase in bio-retention treatment size that would be
required to compensate for the loss of the rainwater tanks and still meet the stormwater quality objectives.
As the proposed development has targeted a higher level of treatment than typically required, the increase
required was not as significant as that necessary for similar developments. It was found that if the bio-
retention filter media area in the basins and swales was increased by 25 percent then the WQOs could be
met. The exception was for areas F and G, where a 50 percent increase in the bio-retention gardens was
required. It would also be necessary to drain the roof areas to the road, rather than directly to underground
drainage. The resultant load removal for the combined site was 83% for TSS, 60% for TP and 48% for TN.
While the water quality objectives can be met if the bio-retention areas are increased, it is still recommended
that rainwater tanks be adopted on site. The proposed development aims to promote the use of ecologically
sensitive design and the use of rainwater tanks plays an important role in this regard. As this will be a Body
Corporate development there will be more control available on the development conditions for each lot. The
use of rainwater tanks will significantly reduce the water demand of the site (by up to 53%), reduce
stormwater flows being discharged off-site and allow the remaining treatment devices to be better target
utilised treating ground and road runoff, rather than relatively clean roof runoff.




Northbrook Corporation Pty Ltd                                                                13 September 2013
O:\5101-19-03\wp\R3v4 SMP\Appendices\App G - RFI responses.docx                                         Page 1

Used in these records

About this file

File size
10.0 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 16- Amended Stormwater Management Plan MCU12_0208.pdf · 10.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.