   It is proposed to combine a detention function within several bio-retention devices. Whilst it is
claimed that more information about these devices will be provided at the detailed design phase, the
main concerns with this approach is the viability of combining detention with bio-retention where
vegetation could be drowned by prolonged periods of rainfall.
The use of bio-retention within detention basins is standard practice. The extended detention zone will not
be different to that of bio-retention basins, and the area will be planted with suitable plants that can tolerate
prolonged periods of ponding. Only the bio-retention zone within the basin will experience prolonged periods
of ponding. The remainder of the basin will be located at a higher level and function similar to a traditional
detention basin.
The outlets of the basins will be suitably sized using a program such as XP-SWMM to show that sufficient
attenuation of peak flows can be provided for all storm events. The bio-retention extended detention zone
will be assumed to be full, as antecedent rainfall may fill this storage volume prior to the peak storm event
occurring.
The Healthy Waterways MUSIC Modelling Guidelines (2010) state that when bio-retention is incorporated
into the base of a retarding basin, that the volume above the top of the extended detention depth should not
be included in the model for water quality assessment. Flood storage was not included in the stormwater
quality modelling. BCC practice notes for bio-retention basins also state that they can be incorporated into
retarding basins.
Off-line detention basins have only been proposed for catchments E3, F7 and F8. These are the catchments
that drain directly to Eenie Creek and its tributaries. The other catchments that drain to Keyser Creek or
Eenie Creek will have “on-line” attenuation of peak flows for all storm events provided by the proposed
culvert crossings. The results of this assessment are summarised in Section 8.2 and Appendix G of the
Flood Study (Cardno, September 2013). Refer to comparison points Q3, Q5 and EC4 in Table G3 to
compare the existing and developed case peak flows. The flood modelling that was conducted for the
developed case assumed that all of the site had developed case inflows (i.e. increased due to the greater
impervious areas), except for catchments E3, F7 and F8, as these flows will be reduced to existing case
levels by the proposed detention basins. The details of these basins will be determined at the detailed
design stage. Although Precinct H drains to a point in Keyser Creek downstream of the proposed culvert
crossings, the over-attenuation provided by these crossings is sufficient to ensure that peak flows are not
increased. It should be noted that the attenuation that will be provided by the bio-retention basins and
rainwater tanks has not been included in the flooding analysis. These will provide some additional
attenuation, particularly for the minor storm events. Therefore the developed case peak flows that have
been modelled are a conservative assumption. Appropriate erosion and scour control measures will be
required on all outlets and culvert crossings.


   Lake Weyba Water Quality Objectives (WQOs) are provided and it‘s further mentioned that Healthy
Waterways undertakes regular monitoring under an Ecosystem Health Monitoring Program. It is
further claimed in relation to this that MUSIC modelling (for the WSUD) background concentrations
can be higher in some instances than the WQOs (eg background Total P concentration in bio-
retention systems is assumed to be 130 g/L, >WQO concentration) and therefore concentration
based WQOs cannot be determined through MUSIC modelling.
From this, the consultant recommends that the results from water quality monitoring carried out by
the Healthy Waterways be used to determine whether there is an impact from the development.
Whilst these results can be used, the applicant will need to be responsible by implementing an
appropriately tailored water monitoring program as the Healthy Waterways monitoring may not suit
the specifics of the proposal and cannot be relied on to continue for the life of the development
especially where a State Government could either halt or reduce funding for such programs.
Section 5.3 addresses this item.
A monitoring program has been proposed for the site so that the existing water quality parameters can be
defined, and the effectiveness of the proposed stormwater treatment devices can be established.




Northbrook Corporation Pty Ltd                                                                  13 September 2013
O:\5101-19-03\wp\R3v4 SMP\Appendices\App G - RFI responses.docx                                           Page 2

Used in these records

About this file

File size
10.0 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 16- Amended Stormwater Management Plan MCU12_0208.pdf · 10.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.