Council archive · source document
Attachment 16- Amended Stormwater Management Plan MCU12/0208
Plans and drawings: the text below has words only, no drawings.
Noosa on Weyba Stormwater Management Plan 2 Site Description The location of the site is shown in Figure 1. The J & K Hofmann land is bounded by Hollett Road to the south, Eenie Creek to the north and it includes lots on both sides of Walter Hay Drive. Ephemeral tributaries of Eenie Creek run through or adjacent to these lots. An existing farm dam is also located within this area. The site is currently used for rural purposes and the majority of the site is densely vegetated with sections that have been cleared for grazing purposes. The site is relatively steeply sloped, and the tributaries are well defined, except for the area just to the north of Hollett Road where the ground is fairly flat and flows disperse over a wide area. The Northbrook Pty Ltd land is located to the south-east of the J & K Hofmann land and is bounded by Tidswell Road to the west and Lake Weyba to the east. The site is currently used for rural purposes. The majority of Lot 11 has been cleared with sections of remnant vegetation. A tributary of Lake Weyba, historically known as Keyser Creek, is located within Lot 11, and drains from south to north. A dam is also located in this area. Keyser Creek, within Lot 11 is relatively flat and low lying with levels ranging from 0.7 to 1.1 mAHD. A track located along the northern boundary of the site currently acts as a bund controlling outflows. It has a minimum level of 1.14 mAHD. At the southern boundary of the site the level of Keyser Creek rises sharply to a minimum level of around 1.8 mAHD. The western section of Lot 11 is relatively flat with a grade of around 1 percent and levels from 0.7 to 6.5 mAHD. The central section of Lot 11 drains towards Keyser Creek and is generally more steeply sloped with levels up to 14.5 mAHD. The eastern section of Lot 11 drains towards Lake Weyba and is generally moderately sloped with a grade of around 5 percent, and levels from 0.5 to 14.5 mAHD. Lake Weyba is connected to Noosa River via Weyba Creek. A geotechnical investigation of the site was carried out; refer Geotechnical Investigation (Cardno, August 2012). The results of this study concluded that subsurface conditions at the site generally consisted of a layer of either loose sands or soft to firm clay underlain by stiff or better clays. Weathered rock was encountered in some of the boreholes. These soils types indicate that infiltration of stormwater will not be a suitable method of disposal. The 1:100000 Gympie Special geological map indicated that the expected subsurface strata across the site would contain Quaternary alluvium along with lithofeldspathic labile and sublabile to quartzose sandstone, siltstone, shale and coal from the late Triassic-Jurassic era. The geology map also indicates a regolith with deep weathering profile. The quaternary alluvium may indicate a possibility of acid sulphate soil (ASS). Soil tests conducted showed that actual and potential ASS was unlikely to be located on the site. However, further testing and sampling is recommended once the area of disturbance is finalised. An acid sulphate soil management plan will be required. Northbrook Corporation Pty Ltd Version 4 16 September 2013 SMP_v4.docx Commercial in Confidence Page 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 16- Amended Stormwater Management Plan MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 10.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.