Council archive · source document
Attachment 16- Amended Stormwater Management Plan MCU12/0208
Plans and drawings: the text below has words only, no drawings.
Noosa on Weyba
Stormwater Management Plan
the integration of water into the landscape to enhance visual, social, cultural and ecological values.
The aim of this report is to determine the overall WSUD strategy for the site. Further analysis will be
conducted during the detailed design stage. This report will:
Determine the relevant water quality objectives (WQO) for the site;
Outline the water sensitive urban design (WSUD) measures that will be adopted for each precinct and
the site as a whole; and
Conduct MUSIC modelling to determine whether WQOs can be met.
The purpose of this version of the report is also to address the relevant items in the Request for
th
Information (RFI) received from Sunshine Coast Regional Council (SCRC) on the 28 of February 2013
(DW008:MCU12/0208).
Northbrook Corporation Pty Ltd Version 4 16 September 2013
SMP_v4.docx Commercial in Confidence Page 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 16- Amended Stormwater Management Plan MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 10.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.