Attachment 3 - Construction Management Plan · OPW25/0206
Plans and drawings: the text below has words only, no drawings.
Site Environmental Management Plan (SEMP)
Introduction
This Site Environmental Management Plan (SEMP) details the potential environmental impacts of the
proposed use and development and the ways that these impacts may be reduced by management
strategies and practices. The objectives of this SEMP are to address environmental, council guidelines
and rehabilitation requirements and ensure that potential environmental impacts are prevented or
mitigated.
A copy of the SEMP must be kept on site at all times during the construction period.
The following has been submitted as part of the SEMP package:
Part A - SEMP Cover Form
Part B - Attachments - Construction Management Plan, WHS Construction Safety Plan, Traffic
Management Plan
Part C - Site Rehabilitation Plan including rehabilitation areas and other necessary documentation
P.O. Box 320, Eudlo E. [email protected]
Queensland, 4554, P. 0408 011 584 | ABN 18 766 198 454
Australia www.biodiverse-environmental.com.au
FLORA | FAUNA | REHABILITATION | FIRE | WATER
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 3 - Construction Management Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.3 MB (small file)
- File type
No other editions are linked here.