Attachment 3 - Construction Management Plan · OPW25/0206
Plans and drawings: the text below has words only, no drawings.
Part A - SEMP Cover Form Site Location 94 Noosa Drive, Noosa Heads, Queensland, 4567 Project Description The scope of works includes tree clearing as per the ‘Site Plan – Tree retention vs removal plan’. Dated 24/11/2025 Project Management Biodiverse Environmental Kate Seehuusen Phone 0400 075 354 Construction Schedule Identify correct location of all boundaries and services prior to commencement of works Locate and identify trees to be removed according to the tree plan Remove and chip trees using a suitably qualified arborist under supervision to be completed within 1 month after OPW permit being issued Construction Techniques/Activities Suitably qualified arborist team will be engaged to remove trees identified by the Site Plan – Tree retention vs removal plan’. Dated 24/11/2025. Climbing arborists will be utilised to ‘piece down’ trees to ensure that there is no off target damage to retained trees. A mobile chipping truck (approx. 12m3) and potentially an EWP (Elevated Work Platform) will be used to complete the tree removal works. A grab will be used to move logs to the chipper. P.O. Box 320, Eudlo E. [email protected] Queensland, 4554, P. 0408 011 584 | ABN 18 766 198 454 Australia www.biodiverse-environmental.com.au FLORA | FAUNA | REHABILITATION | FIRE | WATER
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 3 - Construction Management Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.3 MB (small file)
- File type
No other editions are linked here.