Skip to the record
The gold standard in government transparency.

Council archive · source document

Attachment 3 - Construction Management Plan · OPW25/0206

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
Site Safety and Environmental Risks


                   RISK                                    MEASURES TO ADDRESS RISK

   Outdoor work and work in public               Set up exclusion zones, signs and spotters
   spaces
                                                 Sun safe clothing and correct PPE
                                                 Water and amenities available
                                                 Take adequate break in the shade
                                                 First Aid kit and qualified first aid provider onsite
                                                 Exclude public from site – barriers/cones
   Using powered tools – brush                   Set up exclusion zones, signs and spotters
   cutters, whippers, blowers,
   chainsaws etc.                                Use the most appropriate tool for the task
                                                 Induction/training for use
                                                 Rotate the task to reduce fatigue and share the heavier
                                                 work around
                                                 Use correct PPE
                                                 Check maintenance of plant and equipment
                                                 Clean up and make the area safe at the end of the job
                                                 Follow all relevant SWMS
   Working with/near heavy                       Inspect site prior to work commencing to identify and
   machinery
                                                 remove hazards
                                                 Ensure operators are licensed
                                                 Follow work plans and instructions, ensure pre-start
                                                 meeting
                                                 Use UHF radios to maintain positive communication
                                                 Where practical, eliminate the need for people working
                                                 within heavy machinery zone, or if unavoidable have
                                                 pre-arranged signals and knowledge of movements
                                                 and maintain direct liaison between relevant parties
                                                 Work up-wind or out of fume/dust range
                                                 Only approach machinery at a standstill and never
                                                 from the rear
   Working with/near animals                     Provide appropriate animal handling training




Site Environmental Values

As per Site Plan – Tree retention vs removal plan’. Dated 24/11/2025

As per Weed Management Plan.




                                        P.O. Box 320, Eudlo           E. [email protected]
                                        Queensland, 4554,             P. 0408 011 584 | ABN 18 766 198 454
                                        Australia                     www.biodiverse-environmental.com.au


                                  FLORA | FAUNA | REHABILITATION | FIRE | WATER

Used in these records

About this file

File size
1.3 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 3 - Construction Management Plan.pdf · 1.3 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.