Attachment 3 - Construction Management Plan · OPW25/0206

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
Part B - Management Plans

 Construction Management Plan:                           See Appendix 1
 WHS Management Plan:                                    See Appendix 2
 Pedestrian and Traffic Management Plan:                 See Appendix 3
 Emergency Management Plan:                              See Appendix 4




Part C - Site Rehabilitation Plan

Erosion and sedimentation controls where applicable will be managed in accordance with local
authority requirements to prevent sediment-laden water from entering any sewer, drainage system or
natural waterway.

Controls will be implemented to protect pollution of watercourses from spoil and to prevent creation of
dust nuisance to adjoining neighbours. Construction work will be arranged such that exposed surfaces
are kept to a minimum at all times. Measures will be implemented to minimise the spread of mud on
vehicle tyres on adjoining roadways, including provision for on-site clean up if necessary.

Root balls will remain intact so soil disturbance is minimal. If deemed necessary, a mulch berm may be
installed to prevent any overland flow however due to the topography of the site and the removal
method being low impact this is likely a precautionary measure.

Tree Management Plan
The tree management plan identifies all trees within the project footprint which are to be retained or
removed. Trees to be removed will be identified using fluro marker paint in the form of a X. Trees will be
‘pieced down’ by climbing arborists and /or an EWP. Root balls will remain in the ground and heads will
be chipped.

Appendix 1 - Construction Management Plan
 Construction works
 Is construction in stages?                                       Yes      No

 If Yes, give details of stages for demolition/excavation/construction

         Identify correct location of all boundaries and services prior to commencement of works
         Locate and identify trees to be removed according to the tree plan
         Remove and chip trees using a suitably qualified arborist under supervision
 Is a building permit required for the works?                   Yes     No




                                        P.O. Box 320, Eudlo             E. [email protected]
                                        Queensland, 4554,               P. 0408 011 584 | ABN 18 766 198 454
                                        Australia                       www.biodiverse-environmental.com.au


                                  FLORA | FAUNA | REHABILITATION | FIRE | WATER

Used in these records

About this file

File size
1.3 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 3 - Construction Management Plan.pdf · 1.3 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.