Skip to the record
Trusted by locals. Built for Noosa.

Council archive · source document

Attachment 3 - Construction Management Plan · OPW25/0206

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
                                                 Parking
Near site parking     Control measures to manage parking near site include:
                             Providing staff and contractors with details of available parking sites
                             (including a map if applicable) during works
                             RACV to provide parking for staff and contractors. Machinery will be
                             within the project footprint and away from pedestrians and vehicles
                                                 Signage
Signage                      Signage will be installed in prominent locations on the boundaries of the
                             site advising of the proposed development, the expected time frames
                             and the site contact details
                                   Stormwater and sediment control
Stormwater and        Stormwater and sediment control measures to implement include:
sediment laden               Establishing and maintaining minimum number of entry/exit points for
runoff along roads,          stabilized site access. Ideally this will be a single entry/exit point
drains and                   Establishing and maintaining barriers to divert rainwater from upslope,
footpaths etc.               above the site, away from development area
                                          Traffic Management
Road, Lane            See Traffic Management Plan
Closures and
Mobile Cranes on
Council Land
Pedestrian and        See Traffic Management Plan
cyclist access
around the site
and traffic on
adjoining roads.
Movement of           See Traffic Management Plan
heavy vehicles to
and from the site
                                        Trees and Vegetation
Protection of trees   Control measures to protect trees and vegetation onsite include:
and vegetation               Identifying all trees and vegetation to be protected during construction
onsite                       and performing a survey of these before and after works have taken
                             place
                             Establishing ‘no go’ areas with barriers
                             Tagging trees and plants that are to be protected
                                         Waste Management
Waste material        Control measures to manage waste material onsite include:
onsite                       Avoiding products that are over packaged to reduce waste
                             Minimising over estimation of materials required to reduce waste
                             Performing site clean-up, at least daily, to remove any litter/debris and
                             prevent building waste from blowing off site
Removal of                   Not applicable
hazardous waste
from site (if
applicable)




                                      P.O. Box 320, Eudlo           E. [email protected]
                                      Queensland, 4554,             P. 0408 011 584 | ABN 18 766 198 454
                                      Australia                     www.biodiverse-environmental.com.au


                                FLORA | FAUNA | REHABILITATION | FIRE | WATER

Used in these records

About this file

File size
1.3 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 3 - Construction Management Plan.pdf · 1.3 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.