Attachment 3 - Construction Management Plan · OPW25/0206
Plans and drawings: the text below has words only, no drawings.
Parking
Near site parking Control measures to manage parking near site include:
Providing staff and contractors with details of available parking sites
(including a map if applicable) during works
RACV to provide parking for staff and contractors. Machinery will be
within the project footprint and away from pedestrians and vehicles
Signage
Signage Signage will be installed in prominent locations on the boundaries of the
site advising of the proposed development, the expected time frames
and the site contact details
Stormwater and sediment control
Stormwater and Stormwater and sediment control measures to implement include:
sediment laden Establishing and maintaining minimum number of entry/exit points for
runoff along roads, stabilized site access. Ideally this will be a single entry/exit point
drains and Establishing and maintaining barriers to divert rainwater from upslope,
footpaths etc. above the site, away from development area
Traffic Management
Road, Lane See Traffic Management Plan
Closures and
Mobile Cranes on
Council Land
Pedestrian and See Traffic Management Plan
cyclist access
around the site
and traffic on
adjoining roads.
Movement of See Traffic Management Plan
heavy vehicles to
and from the site
Trees and Vegetation
Protection of trees Control measures to protect trees and vegetation onsite include:
and vegetation Identifying all trees and vegetation to be protected during construction
onsite and performing a survey of these before and after works have taken
place
Establishing ‘no go’ areas with barriers
Tagging trees and plants that are to be protected
Waste Management
Waste material Control measures to manage waste material onsite include:
onsite Avoiding products that are over packaged to reduce waste
Minimising over estimation of materials required to reduce waste
Performing site clean-up, at least daily, to remove any litter/debris and
prevent building waste from blowing off site
Removal of Not applicable
hazardous waste
from site (if
applicable)
P.O. Box 320, Eudlo E. [email protected]
Queensland, 4554, P. 0408 011 584 | ABN 18 766 198 454
Australia www.biodiverse-environmental.com.au
FLORA | FAUNA | REHABILITATION | FIRE | WATER
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 3 - Construction Management Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.3 MB (small file)
- File type
No other editions are linked here.