Council archive · source document
PR18082_BIK_Settlers Cove Stage 4_RevC · OPW18/0253
Attached to the e-mail Operation Works Application OPW18/0253.
Green Tape Solutions
Quality, Integrity, Experience
DISCLAIMER
Apart from fair dealing for the purposes of private study, research, criticism, or review as permitted under the Copyright Act, no
part of this report, its attachments or appendices may be reproduced by any process without the written consent of Green Tape
Solutions. Green Tape Solutions has prepared this report for the sole purposes of the Client. This report is strictly limited to the
purpose and the facts and matters stated in it and does not apply directly or indirectly and will not be used for any other application,
purpose, use or matter. The reproduction, adaptation, use or communication of the information contained within this report may
not be used without the written permission of Green Tape Solutions.
In preparing this report we have assumed that all information and documents provided to us by the Client, or as a result of a
specific request or enquiry, were complete, accurate and up-to-date. Where we have obtained information from a government
register or database, we have assumed that the information is accurate. Where an assumption has been made, we have not made
any independent investigations with respect to the matters the subject of that assumption. We are not aware of any reason why
any of the assumptions are incorrect.
In this note, a reference to loss and damage includes past and prospective economic loss, loss of profits, damage to property,
injury to any person (including death) costs and expenses incurred in taking measures to prevent, mitigate or rectify any harm,
loss of opportunity, legal costs, compensation, interest and any other direct, indirect, consequential or financial or other loss.
Document Records - Quality
Revision Date Prepared by Reviewed by Approved by
(name/title) (name/ title) (name/title)
Kelly Matthews, Director
Version A 6/08/2018 Jasmine Vink, Ecologist Client
/ Principal Ecologist
Kelly Matthews, Director / Kelly Matthews, Director
Version B 25/09/2018 Client
Principal Ecologist / Principal Ecologist
Kelly Matthews, Director / Kelly Matthews, Director
Version C 3/10/2018 Client
Principal Ecologist / Principal Ecologist
Table of Content
1. INTRODUCTION ............................................................................................................................ 3
2. BUSHFIRE MANAGEMENT REQUIREMENT .......................................................................... 4
2.1 ASSET PROTECTION ZONES ........................................................................................................................ 4
2.1.1 Fuel control area......................................................................................................................................4
2.1.2 POSCWP area ............................................................................................................................................5
2.1.3 Fire Break ....................................................................................................................................................6
2.2 REMOVAL OF RUBBISH................................................................................................................................. 6
2.3 WEED TREATMENT AND REMOVAL .......................................................................................................... 6
2.4 FENCING ......................................................................................................................................................... 6
2.5 MAINTENANCE OF FIRE SERVICES ............................................................................................................ 6
2.6 PROPERTY MAINTENANCE ......................................................................................................................... 7
3. PREPARATION AND EVACUATION MANAGEMENT PLAN ............................................... 8
3.1 STEP BY STEP APPROACHES........................................................................................................................ 8
3.2 EVACUATION ................................................................................................................................................. 8
4. IMPLEMENTATION PLAN ........................................................................................................... 9
APPENDIX 1 FIRE-RETARDANT FLORA SPECIES SPECIES WITH FIRE RETARDANT CHARACTERISTIC FOR
FUEL CONTROL AREA (CONSISTENT WITH THE LANDSCAPE MASTER PLAN AND THE ERP) ......................... 11
TABLES
Table 1: Implementation plan for the bushfire within the covenant area ...........................................9
FIGURES
Figure 1: Covenant Area C and Fire Management Control Area (Extract from WMW, 2005) …….3
Figure 2: Cross section of the covenant areas ………………………………………………………4
PR18082_BIK_Settlers Cove Stage 4 ii
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
PR18082_BIK_Settlers Cove Stage 4_RevC.pdfRelated documentApplication case desk ↗
About this file
- File size
- 564 KB (small file)
- File type
No other editions are linked here.