Original source · versioned page text
Minor Change Report MCU22 0087 01 (As Published)
Applicant’s Request
The applicant has requested the currency period for existing condition 48 be extended by an
additional 2 years to read as follows:
CURRENCY PERIOD
48. The Currency Period for this development approval lapses if the development has not
substantially started by 21 July 2027, unless an application to extend the currency period is
approved by Council.
Assessment of Request
Agree
Development Engineering have reviewed the proposed changes to the operational works
documents and confirm the revised operational works plans are consistent with the requested
minor changes to the development approval. The extension of the currently period for an additional
two years is supported.
Recommendation
It is recommended existing condition 48 be amended to read as follows:
CURRENCY PERIOD
48. The Currency Period for this development approval lapses if the development has not
substantially started by 21 July 2025 21 July 2027, unless an application to extend the
currency period is approved by Council.
4. CONSULTATION
4.1. Referral Agencies
4.2. Internal Council Referrals
The application was forwarded to the following internal Council officers for review and/or comment:
• Senior Development Engineer, Development Assessment
• Senior Environment Officer, Development Assessment
5. CONCLUSION & REASONS FOR DECISION
The proposed changes do not raise any significant issues that cannot be addressed by reasonable
and relevant conditions and have been assessed against the original approval and relevant
planning instruments. The amendments maintain compliance with key development parameters,
including maximum building height and storeys above ground level, site cover, plot ratio, and
setbacks and do not introduce new impacts on traffic, infrastructure, or environmental outcomes.
The changes are minor and do not result in a substantially different development.
The application is therefore recommended for approval.
The report is provided in accordance with Section 83(9) of the Planning Act 2016.
Page 31 of 34
Document Set ID: 23692796
Version: 12, Version Date: 20/11/2025
See the original