Skip to the record
Beware of cheap imitations.

Original source · versioned page text

Minor Change Report MCU22 0087 01 (As Published)

of 34

Page text shows just the words. Original shows the document exactly as it was published.

                         C43                      F      Driveway Longsection prepared by 31 October 2025
                                                         Recor Consulting

                         CD-000                   K      Cover Sheet, prepared by, Project 16/10/2025
                                                         Urban

                         CD-001                   C      Specifications   Noes,   Prepared   by, 07/02/2025
                                                         Project Urban

                         CD-100                   K      Landscape Plan – Lower Ground Floor, 16/10/2025
                                                         prepared by, Project Urban

                         CD-101                   I      Landscape Plan – Ground         Floor, 16/10/2025
                                                         prepared by, Project Urban

                         CD-102                   D      Landscape Plan – Second Floor, 13/02/2025
                                                         prepared by, Project Urban

                         CD-103                   D      Landscape Plan – Second Floor, 13/02/2025
                                                         prepared by, Project Urban

                         CD-600                   D      Tree Retention and Removal Plan, 13/02/2025
                                                         prepared by, Project Urban

                         CD-900                   C      Construction Details,    Prepared     by 14/10/2024
                                                         Project Urban

                                        -         1      Arboricultural Impact Assessment, 30/11/2022
                                                         prepared by, Consult Arborist

                      CURRENCY PERIOD
               2.     The Currency Period for this development approval lapses if the development has not
                      substantially started by 21 July 2027, unless an application to extend the currency period is
                      approved by Council.
               F.     Include Reference Document.
               7. REFERENCE DOCUMENTS

                Plan No.       Rev.         Plan/Document Name                                  Date

                22151-         0            Geotechnical Investigation                          13 May 2022
                001
                                            Prepared by Tectonic          Geotechnical   and
                                            Environmental Engineers

               G.     Undertake administrative amendment to the Development Permit for Operational Works,
                      replacing conditions 47 – 107 with conditions 1 – 61.




                                                                                                       Page 34 of 34

Document Set ID: 23692796
Version: 12, Version Date: 20/11/2025
Log in to download the original file

Minor Change Report MCU22 0087 01 (As Published).pdf · 6.6 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.