Original source · versioned page text
Minor Change Report MCU22 0087 01 (As Published)
C43 F Driveway Longsection prepared by 31 October 2025
Recor Consulting
CD-000 K Cover Sheet, prepared by, Project 16/10/2025
Urban
CD-001 C Specifications Noes, Prepared by, 07/02/2025
Project Urban
CD-100 K Landscape Plan – Lower Ground Floor, 16/10/2025
prepared by, Project Urban
CD-101 I Landscape Plan – Ground Floor, 16/10/2025
prepared by, Project Urban
CD-102 D Landscape Plan – Second Floor, 13/02/2025
prepared by, Project Urban
CD-103 D Landscape Plan – Second Floor, 13/02/2025
prepared by, Project Urban
CD-600 D Tree Retention and Removal Plan, 13/02/2025
prepared by, Project Urban
CD-900 C Construction Details, Prepared by 14/10/2024
Project Urban
- 1 Arboricultural Impact Assessment, 30/11/2022
prepared by, Consult Arborist
CURRENCY PERIOD
2. The Currency Period for this development approval lapses if the development has not
substantially started by 21 July 2027, unless an application to extend the currency period is
approved by Council.
F. Include Reference Document.
7. REFERENCE DOCUMENTS
Plan No. Rev. Plan/Document Name Date
22151- 0 Geotechnical Investigation 13 May 2022
001
Prepared by Tectonic Geotechnical and
Environmental Engineers
G. Undertake administrative amendment to the Development Permit for Operational Works,
replacing conditions 47 – 107 with conditions 1 – 61.
Page 34 of 34
Document Set ID: 23692796
Version: 12, Version Date: 20/11/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.