Minor Change Report MCU22 0087 01 (As Published)
26. Bottlebrush Avenue must be upgraded for the length of its frontage to the subject site. The
must include in particular:
a. construction of the kerb and channelling and on-street parking generally as shown on
drawing number C40 revision F prepared by Recor dated 31 October 2025.
b. removal of the existing timber retaining wall in the road reserve; and
c. extension of the kerb and channel to a point 1m past the proposed stormwater outlet
in Bottlebrush Avenue
Site Access and Driveways
28. A sealed access driveway must be provided from Bottlebrush Avenue to all parking and
manoeuvring areas of the development. The works must be generally as shown on drawing
number C40 Revision F prepared by Recor dated 31 October 2025.
Stormwater Drainage
32. The site must be provided with a stormwater drainage system connecting to a lawful point of
discharge. The works must be undertaken generally in accordance with drawing number
C40 revision F prepared by Recor dated 31 October 2025 and include on-site rain water
storage (9,000 litres) used for non-potable purposes. The design of the on-site rain water
system must be submitted to Council at least 5 business days prior to the pre-start meeting.
C Delete Condition 7 of the Development Permit for Material Change of Use.
D Refuse to make the change to Condition 10 of the Development Permit for Material Change
of Use for the following reasons:
1. The applicant has requested that the performance bond amount of $50,000 is reduced
to a total of $30,000. The applicant has not provided any reasoning for the request and
the original development permit was assessed in accordance with the Noosa Plan
2020. There have been no significant changes to the proposal to warrant a reduction
for the performance bond requirement and therefore the request for a reduced
performance bond is not supported. The sum is required in order to ensure the
performance of the conditions of the approval.
E. Amend conditions 1 & 2 of the Development Permit for Operational Works.
Approved Plans – OPW22/0140.01
1. Development undertaken in accordance with this approval must generally comply with the
approved plans of development. The approved plans are listed in the following table unless
otherwise amended by these conditions.
Plan No. Rev. Plan/Document Name Date
C30 F Bulk Earthworks Plan prepared by 31 October 2025
Recor Consulting
C31 F Bulk Earthworks Sections prepared by 31 October 2025
Recor Consulting
C40 F Roads & Drainage Layout Plan 31 October 2025
prepared by Recor Consulting
C41 F Roads & Drainage Details prepared by 31 October 2025
Recor Consulting
C42 F Stormwater Drainage Sections 31 October 2025
prepared by Recor Consulting
Page 33 of 34
Document Set ID: 23692796
Version: 12, Version Date: 20/11/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.