Pensasr Project Construction Management Plan
Plans and drawings: the text below has words only, no drawings.
Project Management Plan
6.2 Work Procedures
Procedures accessed via “O” Drive:
“O” Drive Procedures
6.3 Hazardous Materials & Dangerous Goods Register
As per “Hazardous Substances Procedure” (WHS-PRO-012) the project will maintain a register of
hazardous materials (Commonly known as SDS Register).
7. Traffic Management Folder
Where applicable there is a requirement for a “Traffic Management Folder”. This folder will contain the
following:
• Traffic Management Plan (may also be stored in Folder 1)
• Traffic Management Company & Traffic Controllers (including copies of relevant sub-contract
agreements, registration certificates and licence details)
• Traffic Control Plans
• Permits (issued by the Police, Local Government etc.)
• Traffic Devices – Daily Reports and Checklists
8. “Other Matters” Folder
8.1 Forms
All forms likely to be used on the project can be accessed from the “O” Drive server:
“O” Drive Forms
Project Management Plan (GRP-PLN-001-PROJECT NUMBER) January 2019, Rev: 5
215 David Low Way, Peregian Beach/ G20-010 Page 10 of 11