Council archive · source document
Meeting papers
Very large file (27.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.
4
Noosa Shire Council
Charges Resolution (No.8) 2024
Part 1 Introduction
1. Preliminary
1.1 Short title
The charges resolution may be cited as Noosa Shire Council Charges Resolution (No.8)
2024.
1.2 Planning Legislation
(1) The resolution is made pursuant to section 113 of the Planning Act 2016.
(2) The resolution is to be read in conjunction with the following:
(a) the Planning Regulation 2017;
(b) the local planning instrument.
(3) The resolution is attached to but does not form part of the local planning
instrument.
1.3 Effect
The resolution has effect from 15 August 2024.
1.4 Purpose of the resolution
The purpose of the resolution is to assist with the implementation of the local planning
instrument by stating the following:
(a) an adopted infrastructure charge for determining the levied charge for
funding part of the establishment cost of the following trunk infrastructure
networks:
(i) transport network;
(ii) public parks and land for community facilities network;
(iii) stormwater network;
(iv) water supply network;
(v) sewerage network;
(b) stating other matters relevant to the adopted infrastructure charge.
1.5 Interpretation
(1) In this resolution:
adopted charge rate means the charge to be applied for the purpose of
calculating a levied charge as stated in section 8.3 (Council adopted charge rate).
base date means the date being:
Council Resolution effective 15 August 2024 Page 29 of 90
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.