Noosa Shire Council
Charges Resolution (No.8) 2024
Part 2 Trunk infrastructure networks
5. Trunk infrastructure plans
5.1 Purpose
Section 5 states the trunk infrastructure networks to be funded in part by the levied
infrastructure charge.
5.2 Schedule of works for trunk infrastructure
The trunk infrastructure networks comprise the land and works for trunk infrastructure
detailed in the LGIP and Netserv Plan.
5.3 Trunk infrastructure network systems and items
The trunk infrastructure networks identified in the schedule of works for trunk
infrastructure include the systems and items detailed in the LGIP and Netserv Plan.
5.4 Trunk infrastructure plans
The trunk infrastructure networks identified in the schedule of works for trunk
infrastructure are conceptually identified in the trunk infrastructure plans detailed in the
LGIP and Netserv Plan.
6. Desired standard of service
6.1 Purpose
Section 6 states the desired standard of service which is the standard guiding the delivery
of a trunk infrastructure network.
6.2 Desired standards of service for trunk infrastructure
The desired standard of service for each infrastructure network is detailed in the LGIP and
Netserv Plan.
7. Establishment cost for trunk infrastructure networks
7.1 Purpose
Section 7 states the establishment cost for an identified trunk infrastructure network.
7.2 Establishment cost for a trunk infrastructure network
The establishment cost for the trunk infrastructure networks are detailed in the LGIP and
Netserv Plan.
Council Resolution effective 15 August 2024 Page 34 of 90
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.