Noosa Shire Council
Charges Resolution (No.8) 2024
ACROL is the adopted charge rate for reconfiguring a lot stated in section 8.3
(Council adopted charge rate).
QROL is the total no of lots.
C is the credit stated in section 8.4 (Credit).
Note:
(a) for residential lot reconfiguration, the adopted infrastructure charge
is apportioned across all networks;
(b) for non-residential lot reconfiguration, the adopted infrastructure
charge apportionment excludes the stormwater charge component.
The stormwater charge will be calculated and issued on a
subsequent material change of use or building work approval when
the impervious area is able to be determined.
(2) An infrastructure charge that may be levied for a material change of use or
building work for residential development is generally calculated as follows:
LCR = (Sum(ACR x QR) for each defined use) − C
Where:
LCR is the infrastructure charge that may be levied for a material change of
use or building work for residential development.
ACR is the adopted charge rate for each defined use for a material change of
use or building work for residential development stated in section 8.3
(Council adopted charge rate).
QR is the residential quantity for each defined use.
C is the credit stated in section 8.4 (Credit).
(3) An infrastructure charge that may be levied for a material change of use or
building work for non-residential development is generally calculated as follows:
LC = LCNR + LCSW
Where:
LC is the infrastructure charge that may be levied for the total development
LCNR = (Sum of (AC4 x Q4) for each defined use) − C4
LCSW = (ACSW x QSW) − CSW
LCNR is the infrastructure charge that may be levied for a material change of
use or building work for non-residential development for the transport,
public parks and land for community facilities networks.
LCSW is the levied charge for a material change of use or building work for
non-residential development for the stormwater network.
Council Resolution effective 15 August 2024 Page 36 of 90
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.