Information Request Response

Attached to the e-mail Applicants Response to Information Request - MCU20/0159 OPW20/0245 - 11 Vision Court, Noosaville.

of 4

Page text shows just the words. Original shows the document exactly as it was published.

to be localised for the existing and proposed businesses. As such little impact on the traffic
network is expected in the event a vehicle is reversing onto the site.

Issue – Waste Collection
It is not clear how waste collection will be managed.

Information Required
7. Noting that side lift waste collection trucks do not service on private property, provide a
detailed Waste Management Plan, which must include detail, but not be limited to the
following:
7.1. Number and type of bins to be collected;
7.2. Location of where bins are to be collected;
7.3. Demonstrate how stormwater will not enter the wash bin area;
7.4. Provide details of the bin wash area’s connection to sewer infrastructure;
7.5. Type of vehicle required for the collection;
7.6. Provide travel paths for the required waste collection vehicle, demonstrating how
it will manoeuvre on site without having to use more than a 3 point turn to turn around.

Response
7.1. Number and type of bins to be collected;
The proposed bin enclosure has been designed to accommodate 2 x 1.1m3 bins which can
be collected via a front collection WCV. If 2 x 1.1m3 cubic bins are not considered suitable
by the future tenant of the premises than the equivalent quantity of 240L bins will be
requested and utilized.
7.2. Location of where bins are to be collected;
In the proposed screened bin enclosure located at the front of the site adjacent to the
proposed driveway.
7.3. Demonstrate how stormwater will not enter the wash bin area;
Please refer to the attached and revised Building Design and Civil Design plans which
highlight a bunded wash down pit, the bunded sides ensure stormwater cannot access the
pit which is only intended for bin wash down.
7.4. Provide details of the bin wash area’s connection to sewer infrastructure;
As above and per attached and revised Civil Design plans prepared by Empire Engineers.
7.5. Type of vehicle required for the collection;
Front loaded WCV if 1.1m3 cubic bins utilized, alternatively side collection (kerb collection)
WCV if 240L wheelie bins utilized.
7.6. Provide travel paths for the required waste collection vehicle, demonstrating how
it will manoeuvre on site without having to use more than a 3 point turn to turn around.
As per advice note provided, it is understood waste collection vehicles do not service on
private property, however the attached vehicle movement analysis within the Civil Design
plans demonstrates access and egress can occur if need be.

End of Applicants Response
Log in to download the original file

Information Request Response.pdf · 710 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.