2ND RFI - Attachment 4B - Response to Stormwater Issues ADG · MCU22/0118
Noosa Council
PO Box 141
TEWANTIN QLD 4565
Attention: Patrick Murphy – Coordinator Planning
Your Ref: MCU22/0118
Our Ref: 22366 C L003
13th July 2023
RS /tm
Sunshine Coast Office
RE: 94 AND 142 NOOSA DRIVE, NOOSA HEADS QLD 4567, LOT 3 ON SP126203, LOT 0 ON
SP203417 & LOT 203 ON SP267424
APPLICATION REF: MCU22/0118
RESPONSE TO INFORMATION REQUEST
On behalf of RACV Ltd, ADG Engineers provides the following civil engineering responses to the information
request issued by Noosa Council on the 6th of April 2023, associated with 94 and 142 Noosa Dr, Noosa
Heads (Lot 3 on SP126203, Lot 0 on SP203417 & Lot 203 on SP267424).
INFORMATION REQUEST ITEM ADG RESPONSE
1. UPDATE SWMP, MUSIC & PRELIMINARY ENGINEERING PLANS
1.1 Provide geotechnical borehole and Based on the In Situ Constant Head Permeability Test
test results demonstrating that the conducted by Tectonic Geotechnical & Environmental
proposed ‘pipeless’ bioretention will Engineers on 12.04.23, the MUSIC model for the post-
function at the proposed location by developed site has been updated with the newly derived
providing the following for the saturated hydraulic conductivity value as 115.00mm/hr within
bioretention location: In-situ Soil the 0.4m of the upper soil profile. It is confirmed that the 15L of
classification, Groundwater level water used to pre-soak the site has rapidly drained away within
(BGL and mAHD), and In-situ the existing sandy media proving the area suitable for a pipeless
saturated hydraulic conductivity bioretention basin. The test has confirmed the insitu soil
test results at proposed level of classification in this area as SAND, with organics and no ground
bioretention base water presence up to 1.8m below ground level in the area where
the bioretention basin is proposed.
1.2 Demonstrate that the In-situ Refer to the Section 6 and Appendix H of attached Stormwater
saturated hydraulic conductivity Management Plan (22366 C R10 Rev05 13.07.2023) prepared
results have been correctly applied by ADG.
to the MUSIC model. These rates
should be applied as the
bioretention design saturated hyd
cond
1.3 Provide updated plans showing the The bio-retention basin size is increased to 60m2 area at
spatial requirements for the surface based on the new hydraulics conductivity value as per
updated (enlarged) pipeless the In Situ Constant Head Permeability Test conducted by
bioretention system Tectonic Geotechnical & Environmental Engineers. Refer to
Appendix C of the Stormwater Management Plan (22366 C
R10 Rev05 13.07.2023) prepared by ADG, for updated plans,
BRISBANE / SYDNEY / MELBOURNE / GOLD COAST / SUNSHINE COAST / DARWIN / PERTH ABN 63 131 876 143
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 1 page
Page 2
22366_SK02_POST DEVELOPMENT-[05], and
22366_SK03_BIORETENTION BASIN-PRELIMINARY
DETAILS-[03].
1.4 Provide details of the rainfall-runoff Refer to the Appendix H of attached Stormwater Management
and pollutant export parameters Plan (22366 C R10 Rev05 13.07.2023) prepared by ADG.
adopted for the source nodes in the
MUSIC modelling (pre-
development and post-
development scenarios)
1.5 Show how the rainwater tank The overflow from rainwater tanks are proposed to be
overflows and the runoff from the conveyed using down pipes and discharge into bio basin area
raised walkways will physically be through localised 200mm deep vegetated swales, where the
able to drain to the proposed natural topography falls away from the discharge point. The
bioretention device, as assumed in
runoff from the raised timber walkway will fall directly to the
the MUSIC model
natural surface below, which as demonstrated has adequate
exfiltration properties. In the post-developed MUSIC model, the
timber walkway node is modelled using the parameters for
existing vegetated surface as agreed by NSC Assessment
Officer (Leon Rowland from Switchback Consulting on behalf
of NSC). Further, it is not considered practical to capture water
run-off from a raised timber walkway structure. The bio
infiltration basin has been oversized to compensate for the
water quality catchment area of the walkway structure.
We believe the above responses along with the supporting information adequately addresses the items
raised in Council’s recent correspondence. Should you wish to discuss further, please feel free to contact
me on the above details.
Yours sincerely,
ADG ENGINEERS (AUST) PTY LTD
RAWDON STANFORD
Associate Director - Civil
Page 2 of 2
Used in these records