Original source · versioned page text
Meeting papers
Very large file (13.5 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Section 7.1
Initial Response The majority of emergency incidents will be dealt with by the
relevant lead agency using its own frontline response capabilities.
An Incident Control Centre (ICC) may be established by the
lead agency to focus on the immediate response to reduce the
threat of the hazard. It is up to each lead agency to determine
the circumstances and triggers which require notification to, and
additional support from, the LDMG.
Noosa Council | 2023 Local Disaster Management Plan 75
Page 141 of 192
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.