Original source · versioned page text
Meeting papers
Very large file (13.5 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Section 7.2
Activation of LDMG Timely activation of the LDMG is critical. The LDMG will activate
in response to an actual or perceived threat of a disaster event
which will likely have significant community consequences and
requires a coordinated response and / or recovery effort.
The decision to activate is based upon defined triggers and the
perceived level of threat.
The authority to activate the LDMG is at the discretion of the
LDMG Chair in consultation with the Local Disaster Coordinator
(LDC) based on the nature and scale of the event. The LDMG
Chair will consult with the full membership where time permits.
The LDC is responsible for managing disaster operations and
implementing the strategic direction set by the LDMG.
Noosa Council | 2023 Local Disaster Management Plan 76
Page 142 of 192
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.