Original source · versioned page text
2020-10-12 General Committee Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
GENERAL COMMITTEE MEETING AGENDA 12 OCTOBER 2020
the proposed new entry structure to the rear of the building, distinguishing the entry to
the site from The Parade and Main Beach, is to be setback 0.525m from The Parade
boundary(refer to Figure 12);
Figure 12: Landscaped planters within The Parade boundary setback
the proposed new awning structure above the north facing (beach) side of the Unit U205
terrace is to be setback 1.955m from The Parade boundary (refer to Figure 13);
Page 27 of 84
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.